|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/14/2019 Measured TD: 8150 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/14/2019 | Wellbore Permit | | Permit #: | 20070328 | Expiration Date: | 2/21/2008 | Proposed Depth/Form: | 8144 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N/2 | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5129 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 210, Top: 4239 ft., Bottom: 5129 ft. |
| | |
Wellbore Completed | Completion Date: | 3/14/2007 | Spud Date: | 3/7/2007 | Spud Date Is: | ACTUAL | Measured TD: | 8150 ft. | Measured PB depth: | 8080 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DBL, DUAL IND/COMPENSATED DEN/COMP., NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 738 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 738 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8126 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 6671 ft., Bottom: 8126 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5148 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 266, Top: 3930 ft., Bottom: 5236 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4329 ft. | | N | N | SHANNON | 4870 ft. | | N | N | NIOBRARA | 7260 ft. | | N | N | CODELL | 7549 ft. | | N | N | J SAND | 7980 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/14/2019 Interval Top: 7992 ft. Interval Bottom: 8016 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/28/2007 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/23/2007 | Treatment Summary: | JSND COMPLETION FRAC'D THE J SAND WITH 250,340# 20/40 SAND, 12,000# 20/40 SUPER LC 3/23/07 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7992 ft. | # Of Holes: | 48 | Interval Bottom: | 8016 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/30/2007 Interval Top: 7330 ft. Interval Bottom: 8016 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 3/30/2007 | Choke Size: | 0.188 in. | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/14/2007 | Treatment Summary: | JNBCD COMMINGLE DRILLED UP CFP @ 7430 AND 7630' TO COMMINGLE THE JSND-NBRR -CODL 4/5/07 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7957 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/30/2007 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 32 | BBLS_OIL | 16 | BTU_GAS | 1253 | CALC_BBLS_H2O | 32 | CALC_BBLS_OIL | 16 | CALC_GOR | 12813 | CALC_MCF_GAS | 205 | CASING_PRESS | 230 | MCF_GAS | 205 |
| Perforation Data: | Interval Top: | 7330 ft. | # Of Holes: | 144 | Interval Bottom: | 8016 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/14/2019 Interval Top: 7330 ft. Interval Bottom: 7568 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/28/2007 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/23/2007 | Treatment Summary: | NB-CD RECOMPLETION SET CFP@7630 FRAC'D THE CODL W/150,060# 20/40 SAND, 99,020# 30/50 SAND 110,740 GAL , SET CFP@7430' FRAC'D THE NBRR W/250,400# 20/40 SAND, 160,398 GAL FRAC FLUID 3/23/07. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7330 ft. | # Of Holes: | 96 | Interval Bottom: | 7568 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
Reported Plugged | Y | 02/14/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|