Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24761
Well Classification: OW Status: PA - 3/12/2018
Well Name/No:NISHIMOTO #24-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/12/2018
FacilityID:289199LocationID:336281
County:WELD #123Location:NWSE 36 3N67W 6
Field:WATTENBERG - #90750Elevation:4817 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2190FSL  1944 FELLat/Long: 40.180080 / -104.836560Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.180110 / -104.836600Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 3/12/2018             Measured TD: 7560 ft.    Vertical TD: 7470 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 3/12/2018
Wellbore PermitDIRECTIONAL
Permit #:20070005 Expiration Date:2/4/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2560 FNL  1190 FEL
Bottom Hole Location:Sec:36 Twp: 3N 67W Footage: 2560 FNL  1190 FEL
Proposed Depth/Form:7558 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:4/18/2007
Spud Date:4/11/2007Spud Date Is:ACTUAL
Measured TD:7560 ft.Measured PB depth:7519 ft.
True Vertical TD:7470 ft.True Vertical PB depth:7429 ft.
Top PZ Location:Sec:36 Twp: 3N 67WFootage: 2481 FNL  1257 FEL
Bottom Hole Location:Sec:36 Twp: 3N 67WFootage: 2481 FNL  1257 FEL
Log Types:CAL-ML-CDL-CNL-DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 929 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7554 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 435, Top: 3885 ft., Bottom: 7554 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SHANNON4886 ft.NN
NIOBRARA7125 ft.NN
FORT HAYS7384 ft.NN
CODELL7408 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/20/2007                 Interval Top: 7408 ft.    Interval Bottom: 7427 ft.

 Completed Information for Formation CODELL
1st Production Date:7/17/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/11/2007
Treatment Summary:130,998 GALS FLUID & 220,660 LBS 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7408 ft.# Of Holes:57
Interval Bottom:7427 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/12/2018                 Interval Top: 7145 ft.    Interval Bottom: 7427 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/17/2007Choke Size:0.219 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/18/2007
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/20/2007Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1232
CALC_BBLS_H2O 0
CALC_BBLS_OIL 58
CALC_GOR 4310
CALC_MCF_GAS 250
CASING_PRESS 600
GRAVITY_OIL 53
Perforation Data:
Interval Top:7145 ft.# Of Holes:123
Interval Bottom:7427 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/20/2007                 Interval Top: 7145 ft.    Interval Bottom: 7280 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/17/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/11/2007
Treatment Summary:169,216 GALS FLUID & 252,100 LBS 30/50 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7145 ft.# Of Holes:66
Interval Bottom:7280 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/12/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No