|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 9/1/2025 Measured TD: 7580 ft. Vertical TD: 7482 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 9/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20070006 | Expiration Date: | 2/4/2008 | | Proposed Top PZ Location: | Sec:36 Twp: 3N 67W | Footage: 2393 FSL 2435 FWL | | Bottom Hole Location: | Sec:36 Twp: 3N 67W | Footage: 2393 FSL 2435 FWL | | Proposed Depth/Form: | 7565 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 4/19/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7580 ft. | Measured PB depth: | 7536 ft. | | True Vertical TD: | 7482 ft. | True Vertical PB depth: | 7438 ft. | | Top PZ Location: | Sec:36 Twp: 3N 67W | Footage: 2393 FSL 2435 FWL | | Bottom Hole Location: | Sec:36 Twp: 3N 67W | Footage: 2393 FSL 2435 FWL | | Log Types: | ML-CDL-CNL-CBL-IEL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 904 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 904 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7570 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 3330 ft., Bottom: 7570 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 90 ft., Depth: 3300 ft., Bottom: 3306 ft., Sacks: 780, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3846 ft. | | N | N | | SUSSEX | 4280 ft. | | N | N | | SHANNON | 4888 ft. | | N | N | | NIOBRARA | 7182 ft. | | N | N | | FORT HAYS | 7397 ft. | | N | N | | CODELL | 7418 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 8/10/2007 Interval Top: 7420 ft. Interval Bottom: 7438 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/31/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/14/2007 | | Treatment Summary: | 130,224 GALS FLUID & 221,880 LBS 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7420 ft. | # Of Holes: | 54 | | Interval Bottom: | 7438 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/26/2025 Interval Top: 7184 ft. Interval Bottom: 7438 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/31/2007 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/26/2007 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1232 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 23 | | CALC_GOR | 15830 | | CALC_MCF_GAS | 364 | | CASING_PRESS | 800 | | GRAVITY_OIL | 53 |
| | Perforation Data: | | Interval Top: | 7184 ft. | # Of Holes: | 126 | | Interval Bottom: | 7438 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/10/2007 Interval Top: 7184 ft. Interval Bottom: 7288 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/31/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/14/2007 | | Treatment Summary: | 246,716 GALS FLUID & 200,040 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7184 ft. | # Of Holes: | 72 | | Interval Bottom: | 7288 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (TA ) | Y | Defined Inactive 04/16/2025 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|