|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 11/1/2020 Measured TD: 8055 ft. Vertical TD: 7903 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 11/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/5/2010 | | Proposed Top PZ Location: | Sec:36 Twp: 3N 67W | Footage: 1286 FSL 2548 FWL | | Bottom Hole Location: | Sec:36 Twp: 3N 67W | Footage: 1286 FSL 2548 FWL | | Proposed Depth/Form: | 8055 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 904 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 695, Top: 0 ft., Bottom: 904 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8040 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 620, Top: 3390 ft., Bottom: 8040 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 4/28/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8055 ft. | Measured PB depth: | 8004 ft. | | True Vertical TD: | 7903 ft. | True Vertical PB depth: | 7852 ft. | | Top PZ Location: | Sec:36 Twp: 3N 67 | Footage: 1286 FSL 2548 FWL | | Bottom Hole Location: | Sec:36 Twp: 3N 67 | Footage: 1286 FSL 2548 FWL | | Log Types: | CNL-IEL-CBL-CDL-MUD-ML | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 904 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 0 ft., Bottom: 904 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8040 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 3390 ft., Bottom: 8040 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8040 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 880, Top: 75 ft., Bottom: 3390 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 76 ft., Depth: 3367 ft., Bottom: 3367 ft., Sacks: 880, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3894 ft. | | N | N | | SUSSEX | 4352 ft. | | N | N | | SHANNON | 4942 ft. | | N | N | | NIOBRARA | 7220 ft. | | N | N | | FORT HAYS | 7453 ft. | | N | N | | CODELL | 7474 ft. | | N | N | | J SAND | 7914 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 2/13/2025 Interval Top: 7918 ft. Interval Bottom: 7966 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/2/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/11/2010 | | Treatment Summary: | Frac JSND w/ 161,784 gal SW & 115,060# 40/70 sand & 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | BTU_GAS | 1254 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 21000 | | CALC_MCF_GAS | 63 | | CASING_PRESS | 619 | | GRAVITY_OIL | 50 | | MCF_GAS | 63 | | TUBING_PRESS | 212 |
| | Perforation Data: | | Interval Top: | 7918 ft. | # Of Holes: | 80 | | Interval Bottom: | 7966 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: AB - 2/13/2025 Interval Top: 7476 ft. Interval Bottom: 7494 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/16/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/2/2010 | | Treatment Summary: | No additional treatment. | | Formation Treatment | | Treatment Date: | 6/19/2007 | | Treatment Summary: | 130,907 GALS FLUID & 220,520 LBS 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | BTU_GAS | 1254 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 21334 | | CALC_MCF_GAS | 64 | | CASING_PRESS | 619 | | GRAVITY_OIL | 50 | | MCF_GAS | 64 | | TUBING_PRESS | 212 |
| | Perforation Data: | | Interval Top: | 7476 ft. | # Of Holes: | 54 | | Interval Bottom: | 7494 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/30/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 10/31/2020 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|