|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/16/2022 Measured TD: 7937 ft. Vertical TD: 7876 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/16/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20066403 | Expiration Date: | 1/29/2008 | | Proposed Top PZ Location: | Sec:33 Twp: 3N 67W | Footage: 2564 FNL 1294 FWL | | Bottom Hole Location: | Sec:33 Twp: 3N 67W | Footage: 2564 FNL 1294 FWL | | Proposed Depth/Form: | 7937 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 318A , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 318A , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 3/21/2007 | | Spud Date: | 3/13/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7937 ft. | Measured PB depth: | 7896 ft. | | True Vertical TD: | 7876 ft. | True Vertical PB depth: | 7835 ft. | | Top PZ Location: | Sec:33 Twp: 3N 67W | Footage: 2564 FNL 1294 FWL | | Bottom Hole Location: | Sec:33 Twp: 3N 67W | Footage: 2564 FNL 1294 FWL | | Log Types: | CBL,DUAL IND/COMPENSATED DENSITY/COMP NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 519 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 520 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7907 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 285, Top: 6400 ft., Bottom: 7907 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4206 ft. | | N | N | | SHANNON | 4748 ft. | | N | N | | NIOBRARA | 7082 ft. | | N | N | | CODELL | 7328 ft. | | N | N | | J SAND | 7770 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/17/2022 Interval Top: 7784 ft. Interval Bottom: 7812 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/2/2007 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/5/2011 | | Treatment Summary: | CIBP set @ 7410 and CFP set @ 7200 on 12/5/11. The J Sand is Temporarily Abandoned to test the NBRR-CDL. | | Formation Treatment | | Treatment Date: | 3/27/2007 | | Treatment Summary: | JSND COMPLETION FRAC'D THE J SAND W/ 238,180 #20/40 SAND 12,000# 20/40 SUPER LC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7784 ft. | # Of Holes: | 56 | | Interval Bottom: | 7812 ft. | Hole Size: | 0.4117647 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/6/2019 Interval Top: 7330 ft. Interval Bottom: 7350 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/2/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/5/2011 | | Treatment Summary: | Frac'd w/ 134,530 gal frac fluid and 249,480 # sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7330 ft. | # Of Holes: | 80 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.4166667 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/15/2007 Interval Top: 7124 ft. Interval Bottom: 7912 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/21/2007 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP @ 7250' AND 7450' TO COMMINGLE THE JSND-NBRR-CDL 4/10/07 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7758 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/15/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 98 | | BBLS_OIL | 20 | | CALC_BBLS_H2O | 98 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 41650 | | CALC_MCF_GAS | 833 | | CASING_PRESS | 694 | | MCF_GAS | 833 |
| | Perforation Data: | | Interval Top: | 7124 ft. | # Of Holes: | 176 | | Interval Bottom: | 7912 ft. | Hole Size: | 0.73 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/17/2022 Interval Top: 7124 ft. Interval Bottom: 7350 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/2/2007 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/28/2007 | | Treatment Summary: | NBRR-CDL RECOMPLETION SET CFP @ 7450' FRAC'D THE CODELL W/ 118,513 GAL FRAC FLUID, 164,420 20/40 SAND & 87,580 30/50 SAND SET CFP @ 7250' FRAC'D THE NIOBRARA W/ 165,492 GAL FRAC FLUID, 196,201# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 18 | | BBLS_OIL | 40 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 18 | | CALC_BBLS_OIL | 40 | | CALC_GOR | 5525 | | CALC_MCF_GAS | 221 | | CASING_PRESS | 331 | | GRAVITY_OIL | 53 | | MCF_GAS | 221 |
| | Perforation Data: | | Interval Top: | 7124 ft. | # Of Holes: | 120 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 3/6/2019 Interval Top: 7124 ft. Interval Bottom: 7144 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/2/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/5/2011 | | Treatment Summary: | Frac'd w/ 128,661 gal frac fluid and 250,940 # sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7124 ft. | # Of Holes: | 40 | | Interval Bottom: | 7144 ft. | Hole Size: | 0.4117647 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/17/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|