Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24698
Well Classification: OW Status: PA - 6/24/2022
Well Name/No:RADEMACHER #35-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/24/2022
FacilityID:288953LocationID:336118
County:WELD #123Location:SESW 30 3N67W 6
Field:WATTENBERG - #90750Elevation:4820 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:510FSL  2086 FWLLat/Long: 40.191310 / -104.934310Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.191319 / -104.934310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/24/2022             Measured TD: 7550 ft.    Vertical TD: 7422 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/24/2022
Wellbore PermitDIRECTIONAL
Permit #:20066249 Expiration Date:1/14/2008
Proposed Top PZ Location:Sec:30 Twp: 3N 67W Footage: 76 FSL  1145 FWL
Bottom Hole Location:Sec:30 Twp: 3N 67W Footage: 76 FSL  1145 FWL
Proposed Depth/Form:7473 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:11/29/2007
Spud Date:11/23/2007Spud Date Is:ACTUAL
Measured TD:7550 ft.Measured PB depth:7496 ft.
True Vertical TD:7422 ft.True Vertical PB depth:7368 ft.
Top PZ Location:Sec:30 Twp: 3N 67WFootage: 76 FSL  1145 FWL
Bottom Hole Location:Sec:30 Twp: 3N 67WFootage: 76 FSL  1145 FWL
Log Types:CBL, DIL/GL/GR, CDL/CNL/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 722 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 722 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7530 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 3280 ft., Bottom: 7530 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3703 ft.NN
SUSSEX4156 ft.NN
SHANNON4704 ft.NN
TEEPEE BUTTES6245 ft.NN
NIOBRARA7093 ft.NN
FORT HAYS7348 ft.NN
CODELL7370 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/18/2011                Interval Top: 7371 ft.    Interval Bottom: 7386 ft.

 Completed Information for Formation CODELL
1st Production Date:2/21/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2011
Treatment Summary:CD PERF 7371-7386 HOLES 60 SIZE 0.42 1/20/11 -DRILL & CIRC SAND TO CIBP. DRILL CIBP & PUSH TO 7458' 1/27/11 -COMMINGLE NB-CD PRODUCTION
Formation Treatment
Treatment Date:11/10/2010
Treatment Summary:Sand plug set at 7322' w/fill to 7318'
Formation Treatment
Treatment Date:1/18/2008
Treatment Summary:163,700 GALS FLUID & 4000# 20/40 SAND & 150,800# 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1282
CALC_BBLS_H2O 0
CALC_BBLS_OIL 45
CALC_GOR 2533
CALC_MCF_GAS 114
CASING_PRESS 280
GRAVITY_OIL 53
Perforation Data:
Interval Top:7371 ft.# Of Holes:60
Interval Bottom:7386 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/24/2022                 Interval Top: 7111 ft.    Interval Bottom: 7386 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/27/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2011
Treatment Summary:NB PERF 7111-7248 HOLES 66 SIZE 0.38 CD PERF 7371-7386 HOLES 60 SIZE 0.42 1/20/11 -DRILL & CIRC SAND TO CIBP. DRILL CIBP & PUSH TO 7458' 1/27/11 -COMMINGLE NB-CD PRODUCTION
Tubing Size:2.375 in.Tubing Setting Depth:7350 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/27/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 10
BTU_GAS 1237
CALC_BBLS_OIL 10
CALC_GOR 10000
CALC_MCF_GAS 100
CASING_PRESS 1150
GRAVITY_OIL 49
MCF_GAS 100
TUBING_PRESS 1150
Perforation Data:
Interval Top:7111 ft.# Of Holes:126
Interval Bottom:7386 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 11/18/2011                Interval Top: 7111 ft.    Interval Bottom: 7248 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/13/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2011
Treatment Summary:NB PERF 7111-7248 HOLES 66 SIZE 0.38 1/20/11 -DRILL & CIRC SAND TO CIBP. DRILL CIBP & PUSH TO 7458' 1/27/11 -COMMINGLE NB-CD PRODUCTION
Formation Treatment
Treatment Date:12/7/2010
Treatment Summary:NB Perf: 7111-7248 Holes: 66 Size: .38 Frac NB w/ 250 gal 15% HCl & 247,926 gal Slickwater w/ 200,440# 40/70 sand, 4,000# SB Excel sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_OIL 11
BTU_GAS 1233
CALC_BBLS_OIL 11
CALC_GOR 5454
CALC_MCF_GAS 60
CASING_PRESS 350
MCF_GAS 60
Perforation Data:
Interval Top:7111 ft.# Of Holes:66
Interval Bottom:7248 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/24/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No