Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24642
Well Classification: OW Status: PA - 6/16/2023
Well Name/No:SATER #13-19U
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/16/2023
FacilityID:288754LocationID:306435
County:WELD #123Location:NWSW 19 4N63W 6
Field:WATTENBERG - #90750Elevation:4740 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1907FSL  606 FWLLat/Long: 40.295720 / -104.487530Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.295750 / -104.487560Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 6/16/2023             Measured TD: 7394 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 6/16/2023
Wellbore Permit
Permit #:20065806 Expiration Date:1/3/2008
Proposed Depth/Form:7770 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: W2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SW

Wellbore Completed
Completion Date:4/21/2007
Spud Date:4/15/2007Spud Date Is:ACTUAL
Measured TD:7394 ft.Measured PB depth:7330 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1239 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 0 ft., Bottom: 1239 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7356 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 6166 ft., Bottom: 7356 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 4766 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 205, Top: 3090 ft., Bottom: 4770 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6531 ft.NN
FORT HAYS6749 ft.NN
CODELL6795 ft.NN
J SAND7261 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/16/2023                 Interval Top: 6798 ft.    Interval Bottom: 6804 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/21/2007
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6798 ft.# Of Holes:18
Interval Bottom:6804 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/16/2023                 Interval Top: 6540 ft.    Interval Bottom: 6804 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/9/2007Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/6/2007
Treatment Summary:FRAC'D CODL/NBRR W/500 GAL 15% HCL, 2942 BBLS OF VISTAR 20# FLUID SYSTEM, 338,080 LBS OF 20/40 WHITE SAND AND 16,000 LBS OF SUPER LC 20/40 RESIN COATED PROPPANT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 36
BTU_GAS 1232
CALC_BBLS_H2O 15
CALC_BBLS_OIL 36
CALC_GOR 6528
CALC_MCF_GAS 235
CASING_PRESS 610
GRAVITY_OIL 48
MCF_GAS 235
TUBING_PRESS 220
Perforation Data:
Interval Top:6540 ft.# Of Holes:28
Interval Bottom:6804 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/16/2023                 Interval Top: 6540 ft.    Interval Bottom: 6610 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/21/2007
Treatment Summary:NBRR 'A' 6540-6542 ( 2 SHOTS), NBRR 'B' 6602-6610 (8 SHOTS).
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6540 ft.# Of Holes:10
Interval Bottom:6610 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/16/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/06/2022
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No