|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2020 Measured TD: 7679 ft. Vertical TD: 7595 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | 20065175 | Expiration Date: | 11/20/2007 | Proposed Top PZ Location: | Sec: Twp: | Footage: 2550 FNL 50 FWL | Bottom Hole Location: | Sec:24 Twp: 3N 66W | Footage: 2250 FNL 50 FWL | Proposed Depth/Form: | 7670 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA |
| | |
Wellbore Completed | Completion Date: | 7/13/2007 | Spud Date: | 7/8/2007 | Spud Date Is: | ACTUAL | Measured TD: | 7679 ft. | Measured PB depth: | 7631 ft. | True Vertical TD: | 7595 ft. | True Vertical PB depth: | 7547 ft. | Top PZ Location: | Sec:24 Twp: 3N 66W | Footage: 2555 FNL 70 FWL | Bottom Hole Location: | Sec:24 Twp: 3N 66W | Footage: 2555 FNL 70 FWL | Log Types: | CBL, DIL/GL/GR,CDL,CNL,ML | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 815 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 815 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7664 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 556, Top: 438 ft., Bottom: 7664 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4020 ft. | | N | N | SUSSEX | 4700 ft. | | N | N | NIOBRARA | 7208 ft. | | N | N | FORT HAYS | 7471 ft. | | N | N | CODELL | 7494 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 11/12/2007 Interval Top: 7496 ft. Interval Bottom: 7510 ft. Completed Information for Formation CODELL | 1st Production Date: | 9/26/2007 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/31/2007 | Treatment Summary: | 162,157 GALS FLUID & 115,360 LBS 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7496 ft. | # Of Holes: | 56 | Interval Bottom: | 7510 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 11/1/2020 Interval Top: 7214 ft. Interval Bottom: 7510 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/26/2007 | Choke Size: | 0.156 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/13/2007 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/12/2007 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1212 | CALC_BBLS_OIL | 35 | CALC_GOR | 9514 | CALC_MCF_GAS | 333 | CASING_PRESS | 1617 | GRAVITY_OIL | 52 |
| Perforation Data: | Interval Top: | 7214 ft. | # Of Holes: | 120 | Interval Bottom: | 7510 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/12/2007 Interval Top: 7214 ft. Interval Bottom: 7368 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/26/2007 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/31/2007 | Treatment Summary: | 228,918 GALS FLUID & 200,080 LBS 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7214 ft. | # Of Holes: | 64 | Interval Bottom: | 7368 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 06/11/2025 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 10/31/2020 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|