|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/6/2025 Measured TD: 8150 ft. Vertical TD: 8083 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/6/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/12/2010 | | Proposed Top PZ Location: | Sec:25 Twp: 3N 66W | Footage: 63 FNL 1481 FWL | | Bottom Hole Location: | Sec:25 Twp: 3N 66W | Footage: 63 FNL 1481 FWL | | Proposed Depth/Form: | 8150 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 805 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 805 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8134 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 533, Top: 3970 ft., Bottom: 8134 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 2/13/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8150 ft. | Measured PB depth: | 8101 ft. | | True Vertical TD: | 8083 ft. | True Vertical PB depth: | 8034 ft. | | Top PZ Location: | Sec:25 Twp: 3N 66W | Footage: 63 FNL 1481 FWL | | Bottom Hole Location: | Sec:25 Twp: 3N 66W | Footage: 67 FNL 1477 FWL | | Log Types: | P/E AILC - CNLD - ML-CBL - MUD | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 795 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 795 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8152 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 533, Top: 3984 ft., Bottom: 7727 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8152 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 185, Top: 648 ft., Bottom: 1530 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4178 ft. | | N | N | | SUSSEX | 4504 ft. | | N | N | | SHANNON | 4823 ft. | | N | N | | NIOBRARA | 7214 ft. | | N | N | | FORT HAYS | 7503 ft. | | N | N | | CODELL | 7526 ft. | | N | N | | J SAND | 7995 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 11/6/2025 Interval Top: 7982 ft. Interval Bottom: 8036 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/19/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/19/2010 | | Treatment Summary: | FRAC JSND WITH 149176 GAL SW AND 115100# 40/70 SAND AND 4060# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1257 | | CASING_PRESS | 939 | | GRAVITY_OIL | 53 | | TUBING_PRESS | 746 |
| | Perforation Data: | | Interval Top: | 7982 ft. | # Of Holes: | 56 | | Interval Bottom: | 8036 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 4/19/2010 Interval Top: 7528 ft. Interval Bottom: 7544 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/26/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/8/2007 | | Treatment Summary: | 163,354 GALS FLUID & 109,524 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7528 ft. | # Of Holes: | 64 | | Interval Bottom: | 7544 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/6/2025 Interval Top: 7246 ft. Interval Bottom: 7544 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/19/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/26/2010 | | Treatment Summary: | NBRR PERF 7246-7404 HOLES 100 SIZE 0.42. CODL PERF 7528-7544 HOLES 64 SIZE 0.38. NO ADDITIONAL TREATMENT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 23 | | BTU_GAS | 1257 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 69429 | | CALC_MCF_GAS | 486 | | CASING_PRESS | 939 | | GRAVITY_OIL | 53 | | MCF_GAS | 197 | | TUBING_PRESS | 746 |
| | Perforation Data: | | Interval Top: | 7246 ft. | # Of Holes: | 164 | | Interval Bottom: | 7544 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 4/19/2010 Interval Top: 7246 ft. Interval Bottom: 7404 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/26/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/8/2007 | | Treatment Summary: | 207,299 GALS FLUID & 162,582 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7246 ft. | # Of Holes: | 100 | | Interval Bottom: | 7404 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/06/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|