|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/20/2025 Measured TD: 7641 ft. Vertical TD: 7535 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/20/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20064990 | Expiration Date: | 11/12/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2550 FNL 1340 FEL | | Bottom Hole Location: | Sec:27 Twp: 3N 66W | Footage: 2550 FNL 1340 FEL | | Proposed Depth/Form: | 7349 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 5/13/2007 | | Spud Date: | 5/5/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7641 ft. | Measured PB depth: | 7619 ft. | | True Vertical TD: | 7535 ft. | True Vertical PB depth: | 7513 ft. | | Top PZ Location: | Sec:27 Twp: 3N 66W | Footage: 2560 FNL 1324 FEL | | Bottom Hole Location: | Sec:27 Twp: 3N 66W | Footage: 2560 FNL 1324 FEL | | Log Types: | CBL-LOGGING TOOLS UNABLE TO REACH BOTTOM | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 14 ft., Depth: 706 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 0 ft., Bottom: 706 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 14 ft., Depth: 7648 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 3330 ft., Bottom: 7648 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7184 ft. | | N | N | | FORT HAYS | 7448 ft. | | N | N | | CODELL | 7450 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 5/19/2010 Interval Top: 7450 ft. Interval Bottom: 7466 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/7/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2010 | | Treatment Summary: | RELEASE RBP 06/15/2010 TO COMMINGLE WITH NB PRODUCTION. | | Formation Treatment | | Treatment Date: | 4/9/2010 | | Treatment Summary: | SET RBP@7404 W/2 SACKS OF CEMENT FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT THE CIBP AND CEMENT TO COMMINGLE WELL IN THE NEXT SIX MONTHS. | | Formation Treatment | | Treatment Date: | 6/5/2007 | | Treatment Summary: | 169,252 GALS FLUID & 115,000#'S 40/70 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 46 | | BTU_GAS | 1270 | | CALC_BBLS_OIL | 46 | | CALC_GOR | 5391 | | CALC_MCF_GAS | 248 | | CASING_PRESS | 600 | | GRAVITY_OIL | 53 | | MCF_GAS | 248 |
| | Perforation Data: | | Interval Top: | 7450 ft. | # Of Holes: | 64 | | Interval Bottom: | 7466 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/20/2025 Interval Top: 7181 ft. Interval Bottom: 7466 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/22/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2010 | | Treatment Summary: | RELEASED RBP OVER CD TO COMMINGLE NB/CD PRODUCTION. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7434 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/11/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1249 | | CALC_MCF_GAS | 131 | | CASING_PRESS | 830 | | GRAVITY_OIL | 56 | | MCF_GAS | 131 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 7181 ft. | # Of Holes: | 128 | | Interval Bottom: | 7466 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/19/2010 Interval Top: 7181 ft. Interval Bottom: 7336 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/26/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/22/2010 | | Treatment Summary: | NO ADDITIONAL TREATMENT. COMMINGLED WITH CD PRODUCTION 06/22/2010. | | Formation Treatment | | Treatment Date: | 4/20/2010 | | Treatment Summary: | FRAC NBRR W/504 GAL 15% HC1 & 239,232 GAL SW & 200,000# 40/70 SAND & 40/70 SAND & 4,000# 20.40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/14/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1249 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 7182 | | CALC_MCF_GAS | 158 | | GRAVITY_OIL | 56 |
| | Perforation Data: | | Interval Top: | 7181 ft. | # Of Holes: | 64 | | Interval Bottom: | 7336 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/20/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|