Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24431
Well Classification: GW Status: PA - 11/20/2025
Well Name/No:BARCLAY #24-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/20/2025
FacilityID:287864LocationID:336307
County:WELD #123Location:SWNE 27 3N66W 6
Field:WATTENBERG - #90750Elevation:4933 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1984FNL  2003 FELLat/Long: 40.197970 / -104.760940Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.197964 / -104.760945Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/20/2025             Measured TD: 7641 ft.    Vertical TD: 7535 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/20/2025
Wellbore PermitDIRECTIONAL
Permit #:20064990 Expiration Date:11/12/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2550 FNL  1340 FEL
Bottom Hole Location:Sec:27 Twp: 3N 66W Footage: 2550 FNL  1340 FEL
Proposed Depth/Form:7349 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:5/13/2007
Spud Date:5/5/2007Spud Date Is:ACTUAL
Measured TD:7641 ft.Measured PB depth:7619 ft.
True Vertical TD:7535 ft.True Vertical PB depth:7513 ft.
Top PZ Location:Sec:27 Twp: 3N 66WFootage: 2560 FNL  1324 FEL
Bottom Hole Location:Sec:27 Twp: 3N 66WFootage: 2560 FNL  1324 FEL
Log Types:CBL-LOGGING TOOLS UNABLE TO REACH BOTTOM
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 14 ft., Depth: 706 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 215, Top: 0 ft., Bottom: 706 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 14 ft., Depth: 7648 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 3330 ft., Bottom: 7648 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7184 ft.NN
FORT HAYS7448 ft.NN
CODELL7450 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/19/2010                 Interval Top: 7450 ft.    Interval Bottom: 7466 ft.

 Completed Information for Formation CODELL
1st Production Date:6/7/2007Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/15/2010
Treatment Summary:RELEASE RBP 06/15/2010 TO COMMINGLE WITH NB PRODUCTION.
Formation Treatment
Treatment Date:4/9/2010
Treatment Summary:SET RBP@7404 W/2 SACKS OF CEMENT FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT THE CIBP AND CEMENT TO COMMINGLE WELL IN THE NEXT SIX MONTHS.
Formation Treatment
Treatment Date:6/5/2007
Treatment Summary:169,252 GALS FLUID & 115,000#'S 40/70 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 46
BTU_GAS 1270
CALC_BBLS_OIL 46
CALC_GOR 5391
CALC_MCF_GAS 248
CASING_PRESS 600
GRAVITY_OIL 53
MCF_GAS 248
Perforation Data:
Interval Top:7450 ft.# Of Holes:64
Interval Bottom:7466 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/20/2025                Interval Top: 7181 ft.    Interval Bottom: 7466 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/22/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/15/2010
Treatment Summary:RELEASED RBP OVER CD TO COMMINGLE NB/CD PRODUCTION.
Tubing Size:2.375 in.Tubing Setting Depth:7434 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/11/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1249
CALC_MCF_GAS 131
CASING_PRESS 830
GRAVITY_OIL 56
MCF_GAS 131
TUBING_PRESS 400
Perforation Data:
Interval Top:7181 ft.# Of Holes:128
Interval Bottom:7466 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/19/2010                 Interval Top: 7181 ft.    Interval Bottom: 7336 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/26/2010Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/22/2010
Treatment Summary:NO ADDITIONAL TREATMENT. COMMINGLED WITH CD PRODUCTION 06/22/2010.
Formation Treatment
Treatment Date:4/20/2010
Treatment Summary:FRAC NBRR W/504 GAL 15% HC1 & 239,232 GAL SW & 200,000# 40/70 SAND & 40/70 SAND & 4,000# 20.40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/14/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1249
CALC_BBLS_OIL 22
CALC_GOR 7182
CALC_MCF_GAS 158
GRAVITY_OIL 56
Perforation Data:
Interval Top:7181 ft.# Of Holes:64
Interval Bottom:7336 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/20/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No