Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24211
Well Classification: OW Status: PA - 7/18/2019
Well Name/No:DISTRICT SIX #C6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/18/2019
FacilityID:286487LocationID:332837
Municipality/County:GREELEY / WELD #123Location:NENE 20 5N65W 6
Field:WATTENBERG - #90750Elevation:4674 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:165FNL  1058 FELLat/Long: 40.391430 / -104.681630Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.391330 / -104.681822Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/18/2019             Measured TD: 8324 ft.    Vertical TD: 7261 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/18/2019
Wellbore PermitDIRECTIONAL
Permit #:20063224 Expiration Date:8/29/2007
Proposed Top PZ Location:Sec:17 Twp: 5N 65W Footage: 2063   1973 
Bottom Hole Location:Sec:17 Twp: 5N 65W Footage: 2063   1973 
Proposed Depth/Form:8418 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S2NE4

Wellbore Completed
Completion Date:11/15/2006
Spud Date:11/10/2006Spud Date Is:ACTUAL
Measured TD:8324 ft.Measured PB depth:8261 ft.
True Vertical TD:7261 ft.True Vertical PB depth:7198 ft.
Top PZ Location:Sec:17 Twp: 5N 65WFootage: 2063 FNL  1973 FEL
Bottom Hole Location:Sec:17 Twp: 5N 65WFootage: 2063 FNL  1973 FEL
Log Types:CBL, COMP NEU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 980 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 405, Top: 0 ft., Bottom: 980 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7972 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 665, Top: 2600 ft., Bottom: 7972 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 2390 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 1160 ft., Bottom: 2390 ft., Determination Method: CALC
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 800 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 80 ft., Bottom: 800 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7816 ft.NN
CODELL8123 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/12/2011                 Interval Top: 8124 ft.    Interval Bottom: 8134 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2011
Treatment Summary:Re-frac CODL w/ 149,646 gal fluid and 300,120# 20/40 sand (22,957 gal SW, 126,689 gal xlink gel) ISIP=1975, ISDP=3880, ATP=4036, ATR=21.2
Formation Treatment
Treatment Date:2/1/2007
Treatment Summary:2986.7 BBLS FLUID, 243,980# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 41
BTU_GAS 1258
CALC_BBLS_OIL 41
CALC_GOR 5098
CALC_MCF_GAS 209
CASING_PRESS 1200
GRAVITY_OIL 56
MCF_GAS 209
Perforation Data:
Interval Top:8124 ft.# Of Holes:40
Interval Bottom:8134 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/27/2018                 Interval Top: 7828 ft.    Interval Bottom: 8134 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/12/2011Choke Size:0.000 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:8108 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/24/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 24
BBLS_OIL 28
BTU_GAS 1272
CALC_BBLS_H2O 24
CALC_BBLS_OIL 28
CALC_GOR 3678
CALC_MCF_GAS 103
CASING_PRESS 1540
GRAVITY_OIL 63
MCF_GAS 103
TUBING_PRESS 1420
Perforation Data:
Interval Top:7828 ft.# Of Holes:88
Interval Bottom:8134 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 4/2/2014                  Interval Top: 7828 ft.    Interval Bottom: 7964 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2011
Treatment Summary:Perf. Frac NBRR A [7,828'-7,834'] & NBRR B [7,958'-7,964'] w/ 181,159 gal fluid (70,237 gal SLKW, 110,922 gal XLG)& 295,620# sand (241,500# 20/40 & 54,120# 40/70) ISIP=3550, ISDP=3820, ATP=5320, ATR=49.3
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7828 ft.# Of Holes:48
Interval Bottom:7964 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/18/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No