Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24192
Well Classification: OW Status: PA - 10/24/2018
Well Name/No:REYNOLDS #7-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/24/2018
FacilityID:286454LocationID:336063
County:WELD #123Location:SWNE 23 3N68W 6
Field:WATTENBERG - #90750Elevation:4950 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1348FNL  1693 FELLat/Long: 40.215220 / -104.966860Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.215180 / -104.966910Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/18/2012
End Date: 1/18/2012
Reported: 3/22/2012
Prior to rule 205A.b.(2)(A)
Days to report: 64
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/24/2018             Measured TD: 7575 ft.    Vertical TD: 7473 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/24/2018
Wellbore PermitDIRECTIONAL
Permit #:20063285 Expiration Date:8/28/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2100 FNL  2100 FEL
Bottom Hole Location:Sec:23 Twp: 3N 68W Footage: 2100 FNL  2100 FEL
Proposed Depth/Form:7603 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2NE4

Wellbore Completed
Completion Date:10/12/2006
Spud Date:10/6/2006Spud Date Is:ACTUAL
Measured TD:7575 ft.Measured PB depth:7547 ft.
True Vertical TD:7473 ft.True Vertical PB depth:7445 ft.
Top PZ Location:Sec:23 Twp: 3N 68WFootage: 2094 FNL  2091 FEL
Bottom Hole Location:Sec:23 Twp: 3N 68WFootage: 2094 FNL  2091 FEL
Log Types:CBL, IEL, CDL, CNL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 14 ft., Depth: 753 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 753 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 14 ft., Depth: 7561 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 542, Top: 2010 ft., Bottom: 7561 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3692 ft.NN
SUSSEX4234 ft.NN
SHANNON4716 ft.NN
NIOBRARA7148 ft.NN
FORT HAYS7396 ft.NN
CODELL7416 ft.NN
CARLILE7440 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/24/2018                Interval Top: 7418 ft.    Interval Bottom: 7438 ft.

 Completed Information for Formation CODELL
1st Production Date:3/6/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/3/2012
Treatment Summary:SET CIBP @ 7344' , DUMP BAIL 2 SX SAND
Formation Treatment
Treatment Date:1/3/2007
Treatment Summary:161,401 GALS FLUID & 115,480 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 44
BTU_GAS 1316
CALC_BBLS_OIL 44
CALC_GOR 3273
CALC_MCF_GAS 144
CASING_PRESS 590
GRAVITY_OIL 53
MCF_GAS 144
Perforation Data:
Interval Top:7418 ft.# Of Holes:60
Interval Bottom:7438 ft.Hole Size:0.45 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/24/2018                Interval Top: 7168 ft.    Interval Bottom: 7438 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/14/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/12/2019Treatment End Date:N/A
Treatment Summary:2/8/2012 DRILLED OUT CIBP @ 7,344' AND COMMINGLED NIOBRARA-CODELL.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7168 ft.# Of Holes:124
Interval Bottom:7438 ft.Hole Size:0.45 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/22/2012                 Interval Top: 7168 ft.    Interval Bottom: 7284 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/24/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/18/2012
Treatment Summary:Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 242,676 gal Slickwater w/ 202,200# 40/70.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/22/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1270
CALC_MCF_GAS 86
CASING_PRESS 1475
GRAVITY_OIL 49
MCF_GAS 86
Perforation Data:
Interval Top:7168 ft.# Of Holes:64
Interval Bottom:7284 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/24/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No