|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/24/2018 Measured TD: 7575 ft. Vertical TD: 7473 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/24/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20063285 | Expiration Date: | 8/28/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2100 FNL 2100 FEL | | Bottom Hole Location: | Sec:23 Twp: 3N 68W | Footage: 2100 FNL 2100 FEL | | Proposed Depth/Form: | 7603 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2NE4 |
| | |
| Wellbore Completed | | Completion Date: | 10/12/2006 | | Spud Date: | 10/6/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7575 ft. | Measured PB depth: | 7547 ft. | | True Vertical TD: | 7473 ft. | True Vertical PB depth: | 7445 ft. | | Top PZ Location: | Sec:23 Twp: 3N 68W | Footage: 2094 FNL 2091 FEL | | Bottom Hole Location: | Sec:23 Twp: 3N 68W | Footage: 2094 FNL 2091 FEL | | Log Types: | CBL, IEL, CDL, CNL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 14 ft., Depth: 753 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 753 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 14 ft., Depth: 7561 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 542, Top: 2010 ft., Bottom: 7561 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3692 ft. | | N | N | | SUSSEX | 4234 ft. | | N | N | | SHANNON | 4716 ft. | | N | N | | NIOBRARA | 7148 ft. | | N | N | | FORT HAYS | 7396 ft. | | N | N | | CODELL | 7416 ft. | | N | N | | CARLILE | 7440 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 10/24/2018 Interval Top: 7418 ft. Interval Bottom: 7438 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/6/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/3/2012 | | Treatment Summary: | SET CIBP @ 7344' , DUMP BAIL 2 SX SAND | | Formation Treatment | | Treatment Date: | 1/3/2007 | | Treatment Summary: | 161,401 GALS FLUID & 115,480 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 44 | | BTU_GAS | 1316 | | CALC_BBLS_OIL | 44 | | CALC_GOR | 3273 | | CALC_MCF_GAS | 144 | | CASING_PRESS | 590 | | GRAVITY_OIL | 53 | | MCF_GAS | 144 |
| | Perforation Data: | | Interval Top: | 7418 ft. | # Of Holes: | 60 | | Interval Bottom: | 7438 ft. | Hole Size: | 0.45 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/24/2018 Interval Top: 7168 ft. Interval Bottom: 7438 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/14/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/12/2019 | Treatment End Date: | N/A | | Treatment Summary: | 2/8/2012 DRILLED OUT CIBP @ 7,344' AND COMMINGLED NIOBRARA-CODELL. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7168 ft. | # Of Holes: | 124 | | Interval Bottom: | 7438 ft. | Hole Size: | 0.45 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 2/22/2012 Interval Top: 7168 ft. Interval Bottom: 7284 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/24/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/18/2012 | | Treatment Summary: | Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 242,676 gal Slickwater w/ 202,200# 40/70. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/22/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1270 | | CALC_MCF_GAS | 86 | | CASING_PRESS | 1475 | | GRAVITY_OIL | 49 | | MCF_GAS | 86 |
| | Perforation Data: | | Interval Top: | 7168 ft. | # Of Holes: | 64 | | Interval Bottom: | 7284 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/24/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|