Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24182
Well Classification: GW Status: PA - 12/13/2023
Well Name/No:FRICO #18-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/13/2023
FacilityID:286392LocationID:332632
County:WELD #123Location:SWNE 14 3N65W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Planned Location:1414FNL  1328 FELLat/Long: 40.228580 / -104.625670Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.228590 / -104.625690Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 12/13/2023             Measured TD: 7943 ft.    Vertical TD: 7243 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 12/13/2023
Wellbore PermitDIRECTIONAL
Permit #:20063174 Expiration Date:8/23/2007
Proposed Top PZ Location:Sec:14 Twp: 3N 65W Footage: 1406 FNL  1314 FWL
Bottom Hole Location:Sec:14 Twp: 3N 65W Footage: 1406 FNL  1314 FWL
Proposed Depth/Form:7972 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4

Wellbore Completed
Completion Date:8/18/2007
Spud Date:8/11/2007Spud Date Is:ACTUAL
Measured TD:7943 ft.Measured PB depth:7895 ft.
True Vertical TD:7243 ft.True Vertical PB depth:7195 ft.
Top PZ Location:Sec:14 Twp: 3N 65WFootage: 1406 FNL  1314 FWL
Bottom Hole Location:Sec:14 Twp: 3N 65WFootage: 1406 FNL  1314 FWL
Log Types:CBL, P/E AILC-CNLD-ML
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 726 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 0 ft., Bottom: 726 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7928 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 582, Top: 2986 ft., Bottom: 7928 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3204 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 598 ft., Bottom: 3204 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4064 ft.NN
SUSSEX4540 ft.NN
NIOBRARA7550 ft.NN
FORT HAYS7759 ft.NN
CODELL7781 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/1/2022                  Interval Top: 7781 ft.    Interval Bottom: 7797 ft.

 Completed Information for Formation CODELL
1st Production Date:9/5/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/29/2007
Treatment Summary:171,069 GALS FLUID & 114,628# 30/50 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7781 ft.# Of Holes:64
Interval Bottom:7797 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 12/13/2023                Interval Top: 7550 ft.    Interval Bottom: 7797 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/5/2007Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/18/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1244
CALC_BBLS_H2O 0
CALC_BBLS_OIL 77
CALC_GOR 4320
CALC_MCF_GAS 332
CASING_PRESS 1500
GRAVITY_OIL 51
Perforation Data:
Interval Top:7550 ft.# Of Holes:181
Interval Bottom:7797 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/1/2022                  Interval Top: 7550 ft.    Interval Bottom: 7672 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/5/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/29/2007
Treatment Summary:388,527 GALS FLUID & 299,958# 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7550 ft.# Of Holes:117
Interval Bottom:7672 ft.Hole Size:0.48 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/13/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No