Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24160
Well Classification: GW Status: SI - 3/1/2024
Well Name/No:THOMPSON #24-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 52545
Facility Status:SIStatus Date3/1/2024
FacilityID:286227LocationID:332525
County:WELD #123Location:NWSE 6 3N66W 6
Field:WATTENBERG - #90750Elevation:4780 ft.
Planned Location:1883FSL  2083 FELLat/Long: 40.251640 / -104.818220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.251630 / -104.818220Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 3/1/2024             Measured TD: 7564 ft.    Vertical TD: 7445 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 3/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20063429 Expiration Date:8/15/2007
Prop Depth/Form:7545 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:1/9/2007
Spud Date:1/3/2007Spud Date Is:ACTUAL
Measured TD:7564 ft.Measured PB depth:7527 ft.
True Vertical TD:7445 ft.True Vertical PB depth:7408 ft.
Top PZ Location:Sec:6 Twp: 3N 66WFootage: 2573 FSL  1400 FELDepth
Bottom Hole Location:Sec:6 Twp: 3N 66WFootage: 2573 FSL  1400 FELDepth
Log Types:ML-IEL-CVL-CDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 12 ft., Depth: 592 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 592 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 12 ft., Depth: 7558 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 3640 ft., Bottom: 7558 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3834 ft.NN
SUSSEX4312 ft.NN
SHANNON4910 ft.NN
NIOBRARA7124 ft.NN
FORT HAYS7379 ft.NN
CODELL7410 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/19/2007                 Interval Top: 7412 ft.    Interval Bottom: 7430 ft.

 Completed Information for Formation CODELL
1st Production Date:5/17/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/23/2007
Treatment Summary:163,975 GALS FLUID & 115,780 LBS 30/50 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7412 ft.# Of Holes:54
Interval Bottom:7430 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 3/1/2024                  Interval Top: 7130 ft.    Interval Bottom: 7430 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/17/2007Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/9/2007
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7379 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/19/2007Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 7
BTU_GAS 1279
CALC_BBLS_H2O 0
CALC_BBLS_OIL 7
CALC_GOR 17429
CALC_MCF_GAS 122
CASING_PRESS 800
GRAVITY_OIL 53
MCF_GAS 122
TUBING_PRESS 420
Perforation Data:
Interval Top:7130 ft.# Of Holes:104
Interval Bottom:7430 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/19/2007                 Interval Top: 7130 ft.    Interval Bottom: 7290 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/17/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/24/2007
Treatment Summary:198,586 GALS FLUID & 153,180 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7130 ft.# Of Holes:50
Interval Bottom:7290 ft.Hole Size:0.42 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedYCut and Cap Date
12/10/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
04/30/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2023 - 09/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22
GOR
GOR DeterminationMCFE
Average BOE per Day0.011
Average MCFE per Day0.060

 Federal Financial Assurance  i 

 Tribal Well  i No