|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 12/4/2021 Measured TD: 7412 ft. Vertical TD: 7305 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 12/4/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20063276 | Expiration Date: | 8/8/2007 | | Proposed Top PZ Location: | Sec:11 Twp: 3N 67W | Footage: 1218 FSL 2558 FEL | | Bottom Hole Location: | Sec:11 Twp: 3N 67W | Footage: 1218 FSL 2558 FEL | | Proposed Depth/Form: | 7371 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: E2SW4 |
| | |
| Wellbore Completed | | Completion Date: | 8/26/2006 | | Spud Date: | 8/14/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7412 ft. | Measured PB depth: | 7369 ft. | | True Vertical TD: | 7305 ft. | True Vertical PB depth: | 7262 ft. | | Top PZ Location: | Sec:11 Twp: 3N 67W | Footage: 1218 FSL 2558 FEL | | Bottom Hole Location: | Sec:11 Twp: 3N 67W | Footage: 1218 FSL 2558 FEL | | Log Types: | CNLD, PEML, CBL, AILC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 727 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 727 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7384 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 2518 ft., Bottom: 7384 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3720 ft. | | N | N | | SUSSEX | 4160 ft. | | N | N | | SHANNON | 4729 ft. | | N | N | | NIOBRARA | 6948 ft. | | N | N | | FORT HAYS | 7227 ft. | | N | N | | CODELL | 7250 ft. | | N | N | | CARLILE | 7270 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 9/27/2011 Interval Top: 7250 ft. Interval Bottom: 7270 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/4/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/11/2006 | | Treatment Summary: | 110,058 GALS FLUID & 205,800# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7250 ft. | # Of Holes: | 60 | | Interval Bottom: | 7270 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/6/2021 Interval Top: 6974 ft. Interval Bottom: 7270 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/4/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/7/2011 | | Treatment Summary: | Re-Frac Codell down 4-1/2" Csg w/ 258,216 gal Slickwater w/ 208,040# 40/70, 4,000# SB Excel, 0# . | | Formation Treatment | | Treatment Date: | 8/26/2006 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7220 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/24/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 4 | | BTU_GAS | 1188 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 8250 | | CALC_MCF_GAS | 33 | | CASING_PRESS | 1304 | | GRAVITY_OIL | 52 | | MCF_GAS | 33 | | TUBING_PRESS | 1185 |
| | Perforation Data: | | Interval Top: | 6974 ft. | # Of Holes: | 170 | | Interval Bottom: | 7270 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 9/27/2011 Interval Top: 6974 ft. Interval Bottom: 7130 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/4/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/11/2006 | | Treatment Summary: | 172,312 GALS FLUID & 250,660# 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6974 ft. | # Of Holes: | 110 | | Interval Bottom: | 7130 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/04/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|