|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/27/2022 Measured TD: 8090 ft. Vertical TD: 7998 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/27/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20062988 | Expiration Date: | 8/7/2007 | | Proposed Top PZ Location: | Sec:20 Twp: 3N 66W | Footage: 34 FSL 1308 FWL | | Bottom Hole Location: | Sec:20 Twp: 3N 66W | Footage: 34 FSL 1308 FWL | | Proposed Depth/Form: | 8054 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5350 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 295, Top: 4100 ft., Bottom: 5350 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/6/2007 | | Spud Date: | 3/27/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8090 ft. | Measured PB depth: | 8025 ft. | | True Vertical TD: | 7998 ft. | True Vertical PB depth: | 7933 ft. | | Top PZ Location: | Sec:20 Twp: 3N 66W | Footage: 34 FSL 1308 FWL | | Bottom Hole Location: | Sec:20 Twp: 3N 66W | Footage: 34 FSL 1308 FWL | | Log Types: | CBL, DUAL IND/COMP.DENSITY/COP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 645 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 515 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8045 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 235, Top: 6238 ft., Bottom: 8045 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5326 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 3760 ft., Bottom: 5326 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4382 ft. | | N | N | | SHANNON | 4990 ft. | | N | N | | NIOBRARA | 7178 ft. | | N | N | | CODELL | 7450 ft. | | N | N | | J SAND | 7896 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/27/2022 Interval Top: 7896 ft. Interval Bottom: 7960 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/22/2011 | | Treatment Summary: | J-SAND IS TEMPORARILY ABANDONED TO TEST THE NIOBRARA/CODELL FORMATION. A CIBP WAS SET @ 7520 ON 10/22/11. | | Formation Treatment | | Treatment Date: | 4/15/2007 | | Treatment Summary: | JSND COMPLETION FRAC'D THE J SAND WITH 159,080 GAL FRAC FLUID AND 250,520# SAND. 4/15/07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7896 ft. | # Of Holes: | 92 | | Interval Bottom: | 7960 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: CM - 2/9/2022 Interval Top: 7450 ft. Interval Bottom: 7470 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7450 ft. | # Of Holes: | 80 | | Interval Bottom: | 7470 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/8/2007 Interval Top: 7188 ft. Interval Bottom: 7960 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/6/2007 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/6/2007 | | Treatment Summary: | JNBCD COMMINGLE DRILLED OUT CFP @ 7550' AND 7350' TO COMMINGLE THE JNBCD. 05/03/07 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7878 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/8/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 38 | | BTU_GAS | 1221 | | CALC_BBLS_H2O | 30 | | CALC_BBLS_OIL | 38 | | CALC_GOR | 15789 | | CALC_MCF_GAS | 600 | | CASING_PRESS | 1987 | | GRAVITY_OIL | 60.4 | | MCF_GAS | 600 | | TUBING_PRESS | 1364 |
| | Perforation Data: | | Interval Top: | 7188 ft. | # Of Holes: | 252 | | Interval Bottom: | 7960 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/27/2022 Interval Top: 7188 ft. Interval Bottom: 7470 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/8/2011 | | Treatment Summary: | NIOBRARA - FRAC'D 7188-7256 W/159,086 GAL FRAC FLUID AND 251,700 # SAND.
CODELL - FRAC'D 7450-7470 W/121,626 GAL FRAC FLUID AND 250,425 # SAND.
SET CIBP @7520' AND CFP @ 7280' ON 10/22/11. CFP DRILLED OUT 11/10/11. | | Formation Treatment | | Treatment Date: | 4/15/2007 | | Treatment Summary: | NB-CD RECOMPLETION SET CFP @ 7550'. 4/15/07. FRAC'D THE CODL W/120,749 GAL FRAC FLUID AND 262,040# SAND, SET CFP @ 7350'. 4/15/07. FRAC'D THE NBRR W/138,675 GAL FRAC FLUID AND 262,160# SD. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 20 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 15735 | | CALC_MCF_GAS | 535 | | CASING_PRESS | 1149 | | GRAVITY_OIL | 42 | | MCF_GAS | 312 | | TUBING_PRESS | 743 |
| | Perforation Data: | | Interval Top: | 7188 ft. | # Of Holes: | 160 | | Interval Bottom: | 7470 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 2/9/2022 Interval Top: 7188 ft. Interval Bottom: 7256 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7188 ft. | # Of Holes: | 80 | | Interval Bottom: | 7256 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/27/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|