|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2020 Measured TD: 7673 ft. Vertical TD: 7575 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20061538 | Expiration Date: | 5/9/2007 | | Proposed Top PZ Location: | Sec:8 Twp: 3N 66W | Footage: 1307 FSL 2579 FEL | | Bottom Hole Location: | Sec:8 Twp: 3N 66W | Footage: 1307 FSL 2579 FEL | | Proposed Depth/Form: | 7631 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: ALL |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 7/20/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7673 ft. | Measured PB depth: | 7624 ft. | | True Vertical TD: | 7575 ft. | True Vertical PB depth: | 7526 ft. | | Top PZ Location: | Sec:8 Twp: 3N 66W | Footage: 1307 FSL 2579 FEL | | Bottom Hole Location: | Sec:8 Twp: 3N 66W | Footage: 1307 FSL 2579 FEL | | Log Types: | PEML,CNLD,CBL,AILC,PECL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 853 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 345, Top: 0 ft., Bottom: 853 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7668 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 575, Top: 3530 ft., Bottom: 7668 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7668 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 0 ft., Bottom: 3430 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 400 ft., Depth: 7668 ft., Bottom: 3693 ft., Sacks: 650, Method: NON CEMENT SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3910 ft. | | N | N | | SUSSEX | 4372 ft. | | N | N | | SHANNON | 4989 ft. | | N | N | | NIOBRARA | 7182 ft. | | N | N | | FORT HAYS | 7453 ft. | | N | N | | CODELL | 7474 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 2/2/2011 Interval Top: 7476 ft. Interval Bottom: 7494 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/9/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/7/2006 | | Treatment Summary: | 115,140 GALS FLUID & 176,916 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7476 ft. | # Of Holes: | 54 | | Interval Bottom: | 7494 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 9/1/2020 Interval Top: 7188 ft. Interval Bottom: 7494 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/9/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/28/2010 | | Treatment Summary: | NB Perf 7188-7350 Holes 116 Size 0.42
CD Perf 7476-7494 Holes 54 Size 0.42
Re-Frac Codell / Niobrara down 4-1/2" Csg w/ 429,450 gal Slickwater w/ 342,820# 40/70, 8,000# SuperLC | | Formation Treatment | | Treatment Date: | 7/28/2006 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/24/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 6 | | BTU_GAS | 1235 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 28000 | | CALC_MCF_GAS | 168 | | CASING_PRESS | 1 | | GRAVITY_OIL | 57 | | MCF_GAS | 168 |
| | Perforation Data: | | Interval Top: | 7188 ft. | # Of Holes: | 170 | | Interval Bottom: | 7494 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 2/2/2011 Interval Top: 7188 ft. Interval Bottom: 7350 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/9/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/7/2006 | | Treatment Summary: | 176,916 GAL FLUID & 250,260 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7188 ft. | # Of Holes: | 116 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/04/2026 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 08/31/2020 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|