|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 10/1/2023 Measured TD: 7830 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 10/1/2023 | | Wellbore Permit | | | Permit #: | 20061101 | Expiration Date: | 4/26/2007 | | Proposed Depth/Form: | 7824 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4 | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 160, Drill Unit: SW/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4000 ft., Bottom: 5000 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/15/2007 | | Spud Date: | 1/9/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7830 ft. | Measured PB depth: | 7796 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 414 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 414 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7820 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 6170 ft., Bottom: 7820 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7820 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 3530 ft., Bottom: 5008 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4315 ft. | | N | N | | SHANNON | 4825 ft. | | N | N | | NIOBRARA | 6915 ft. | | N | N | | CODELL | 7212 ft. | | N | N | | J SAND | 7696 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 10/1/2023 Interval Top: 7696 ft. Interval Bottom: 7750 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/8/2007 | | Treatment Summary: | JSND COMPLETION FRAC'D THE J SAND WITH 155,800 GAL FRAC FLUID AND 238,360# 30/50 SAND, 12,000# 12/20 SB EXCEL RCS.03/08-07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7696 ft. | # Of Holes: | 80 | | Interval Bottom: | 7750 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/14/2007 Interval Top: 6916 ft. Interval Bottom: 7750 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/15/2007 | | Treatment Summary: | JNBCD COMMINGLE DRILLED UP CFP @ 7100 AND 7340' TO COMMINGLE THE JSND-NBRR-CODL 03/30/07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/14/2007 | Test Method: | FLOWONG | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 160 | | BBLS_OIL | 108 | | BTU_GAS | 1162 | | CALC_BBLS_H2O | 160 | | CALC_BBLS_OIL | 108 | | CALC_GOR | 7315 | | CALC_MCF_GAS | 790 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 61 | | MCF_GAS | 790 |
| | Perforation Data: | | Interval Top: | 6916 ft. | # Of Holes: | 212 | | Interval Bottom: | 7750 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 10/1/2023 Interval Top: 6916 ft. Interval Bottom: 7228 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/8/2007 | | Treatment Summary: | NB-CD RECOMPLETION SET CFP@7340'. 3/08/07. FRAC'D THE CODL W/113,100 GAL FRAC FLUID AND 251,120# 30/50 SAND. 3/08/07 SET CFP@7100'. 3/08/07. FRAC'D THE NBRR W/167,370 GAL FRAC FLUID AND 250,280# 30/50 SAND. 3/08/07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6916 ft. | # Of Holes: | 132 | | Interval Bottom: | 7228 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/14/2026 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 09/09/2029 |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 01/29/2025 |
| Defined Inactive (SI ) | Y | Defined Inactive 09/30/2023 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|