|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 5/10/2024 Measured TD: 7712 ft. Vertical TD: 7515 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 5/10/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20060229 | Expiration Date: | 3/6/2007 | | Proposed Top PZ Location: | Sec:22 Twp: 3N 66W | Footage: 1136 FNL 2758 FWL | | Bottom Hole Location: | Sec:22 Twp: 3N 66W | Footage: 1136 FNL 2758 FWL | | Proposed Depth/Form: | 7677 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: ALL |
| | |
| Wellbore Completed | | Completion Date: | 4/16/2006 | | Spud Date: | 4/10/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7712 ft. | Measured PB depth: | 7641 ft. | | True Vertical TD: | 7515 ft. | True Vertical PB depth: | 7444 ft. | | Top PZ Location: | Sec:22 Twp: 3N 66W | Footage: 1136 FNL 2758 FWL | | Bottom Hole Location: | Sec:22 Twp: 3N 66W | Footage: 1136 FNL 2758 FWL | | Log Types: | CBL, PECL, PEML, AILC, CNLD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 745 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 505, Top: 0 ft., Bottom: 745 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7672 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 3321 ft., Bottom: 7672 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3840 ft. | | N | N | | SUSSEX | 4510 ft. | | N | N | | NIOBRARA | 7270 ft. | | N | N | | FORT HAYS | 7531 ft. | | N | N | | CODELL | 7556 ft. | | N | N | | CARLILE | 7572 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 8/25/2011 Interval Top: 7556 ft. Interval Bottom: 7572 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/9/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/8/2006 | | Treatment Summary: | 152,784 GALS FLUID & 115,000 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7556 ft. | # Of Holes: | 48 | | Interval Bottom: | 7572 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/10/2024 Interval Top: 7280 ft. Interval Bottom: 7572 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/10/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/5/2011 | | Treatment Summary: | CDL REPERF (7/29/2011) 7556-7572 HOLES 16 SIZE .38
Re-Frac Codell down 4-1/2" Csg w/ 269,388 gal Slickwater w/ 207,320# 40/70, 4,000# SB Excel.
| | Formation Treatment | | Treatment Date: | 5/8/2006 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/22/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 13 | | BTU_GAS | 1271 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 22154 | | CALC_MCF_GAS | 288 | | CASING_PRESS | 2250 | | GRAVITY_OIL | 60 | | MCF_GAS | 288 |
| | Perforation Data: | | Interval Top: | 7280 ft. | # Of Holes: | 180 | | Interval Bottom: | 7572 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/25/2011 Interval Top: 7280 ft. Interval Bottom: 7440 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/9/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/8/2006 | | Treatment Summary: | 169,229 GALS FLUID & 251,000 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7280 ft. | # Of Holes: | 116 | | Interval Bottom: | 7440 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/10/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|