|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/30/2022 Measured TD: 7330 ft. Vertical TD: 7274 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/30/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20050074 | Expiration Date: | 2/21/2007 | | Proposed Top PZ Location: | Sec:17 Twp: 3N 67W | Footage: 1192 FNL 1406 FWL | | Bottom Hole Location: | Sec:17 Twp: 3N 67W | Footage: 1192 FNL 1406 FWL | | Proposed Depth/Form: | 7352 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 |
| | |
| Wellbore Completed | | Completion Date: | 7/22/2006 | | Spud Date: | 7/16/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7330 ft. | Measured PB depth: | 7290 ft. | | True Vertical TD: | 7274 ft. | True Vertical PB depth: | 7234 ft. | | Top PZ Location: | Sec:17 Twp: 3N 67W | Footage: 1192 FNL 1406 FWL | | Bottom Hole Location: | Sec:17 Twp: 3N 67W | Footage: 1192 FNL 1406 FWL | | Log Types: | CBL, P/E AILC - CNLD - ML - CVCL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 12 ft., Depth: 764 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 764 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 12 ft., Depth: 7324 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 3250 ft., Bottom: 7324 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3560 ft. | | N | N | | SUSSEX | 4034 ft. | | N | N | | SHANNON | 4558 ft. | | N | N | | NIOBRARA | 6880 ft. | | N | N | | FORT HAYS | 7152 ft. | | N | N | | CODELL | 7175 ft. | | N | N | | CARLILE | 7196 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 9/15/2006 Interval Top: 7176 ft. Interval Bottom: 7196 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/9/2006 | Choke Size: | 0.281 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/1/2006 | | Treatment Summary: | 109,984 GALS FLUID & 205,320# 20/40 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7151 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/15/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 81 | | BTU_GAS | 1292 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 81 | | CALC_GOR | 3580 | | CALC_MCF_GAS | 290 | | CASING_PRESS | 933 | | GRAVITY_OIL | 52 | | MCF_GAS | 290 | | TUBING_PRESS | 650 |
| | Perforation Data: | | Interval Top: | 7176 ft. | # Of Holes: | 168 | | Interval Bottom: | 7196 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/30/2022 Interval Top: 6926 ft. Interval Bottom: 7196 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/16/2010 | Choke Size: | 0.375 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/10/2010 | | Treatment Summary: | NB PERF 6926-7032 HOLES 62 SIZE 0.42 CD PERF 7176-7196 HOLES 104 SIZE 0.38 FRAC NB W/ 500 GAL 15% HCI & 244,130 GAL SW W/ 200,880# 40/70 & 4,000 # 20/40 SB EXCEL. RE-FRAC CD W/ 117,616 GAL SUPERZ LPH W/ 261,800# 20/40 & 4,000# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/10/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1304 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 48 | | CALC_GOR | 9938 | | CALC_MCF_GAS | 477 | | CASING_PRESS | 225 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 6926 ft. | # Of Holes: | 166 | | Interval Bottom: | 7196 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 8/1/2020 Interval Top: 6926 ft. Interval Bottom: 7032 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6926 ft. | # Of Holes: | 62 | | Interval Bottom: | 7032 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/30/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|