|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/30/2025 Measured TD: 7396 ft. Vertical TD: 7301 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/30/2025 | Wellbore Permit | DIRECTIONAL | Permit #: | 20054738 | Expiration Date: | 1/17/2007 | Proposed Top PZ Location: | Sec:34 Twp: 4N 67W | Footage: 1298 FSL 53 FWL | Bottom Hole Location: | Sec:34 Twp: 4N 67W | Footage: 1298 FSL 53 FWL | Proposed Depth/Form: | 7513 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: ALL |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 3/9/2006 | Spud Date Is: | ACTUAL | Measured TD: | 7396 ft. | Measured PB depth: | 7377 ft. | True Vertical TD: | 7301 ft. | True Vertical PB depth: | 7282 ft. | Top PZ Location: | Sec:34 Twp: 4N 67W | Footage: 1298 FSL 53 FWL | Bottom Hole Location: | Sec:34 Twp: 4N 67W | Footage: 1298 FSL 53 FWL | Log Types: | PEML, AILC, CNLD, CBL, PERF/CCL | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 796 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 796 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7396 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 480, Top: 3680 ft., Bottom: 7396 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7396 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 240, Top: 54 ft., Bottom: 1550 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3604 ft. | | N | N | SUSSEX | 4080 ft. | | N | N | SHANNON | 4630 ft. | | N | N | TEEPEE BUTTES | 6140 ft. | | N | N | NIOBRARA | 6952 ft. | | N | N | FORT HAYS | 7213 ft. | | N | N | CODELL | 7234 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 4/11/2010 Interval Top: 7238 ft. Interval Bottom: 7258 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/25/2006 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/24/2006 | Treatment Summary: | 144,756 GALS FLUID & 115,240# 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7238 ft. | # Of Holes: | 60 | Interval Bottom: | 7258 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/30/2025 Interval Top: 6960 ft. Interval Bottom: 7258 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/25/2006 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/22/2010 | Treatment Summary: | NBRR PERF 6960-7104 HOLES 92 SIZE 0.42. REFRAC NB-CD W/150,790# SAND FOR CODL & 20 BIO-BALLS IN FLUSH & 20 BIO-BALLS IN 1000 GAL & 20 BIO-BALLS IN PAD & 203,439# SAND FOR NBRR. RETURNED TO PRODUCTION 04/06/2010. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 22 | BTU_GAS | 1240 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 10 | CALC_GOR | 16000 | CALC_MCF_GAS | 160 | CASING_PRESS | 912 | GRAVITY_OIL | 53 | MCF_GAS | 154 | TUBING_PRESS | 838 |
| Perforation Data: | Interval Top: | 6960 ft. | # Of Holes: | 152 | Interval Bottom: | 7258 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/11/2010 Interval Top: 6960 ft. Interval Bottom: 7104 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/25/2006 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/24/2006 | Treatment Summary: | 170,402 GALS FLUID & 252,620# 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6960 ft. | # Of Holes: | 92 | Interval Bottom: | 7104 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 01/30/2025 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | Y | Noticed Date 03/18/2025 |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|