|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 4/1/2025 Measured TD: 7924 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 4/1/2025 | | Wellbore Permit | | | Permit #: | 20085468 | Expiration Date: | 8/27/2009 | | Proposed Depth/Form: | 7924 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 697 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 480, Top: 0 ft., Bottom: 697 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7879 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 610, Top: 3230 ft., Bottom: 7879 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/23/2006 | | Spud Date: | 4/18/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7924 ft. | Measured PB depth: | 7868 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIGL,CDCN,CBL,ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 697 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 0 ft., Bottom: 697 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7882 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 610, Top: 3230 ft., Bottom: 7882 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4150 ft. | | N | N | | SHANNON | 4668 ft. | | N | N | | NIOBRARA | 7052 ft. | | N | N | | FORT HAYS | 7284 ft. | | N | N | | CODELL | 7304 ft. | | N | N | | J SAND | 7738 ft. | | N | N |
Formation JSND Formation Classification: OG Status: TA - 1/1/2017 Interval Top: 7740 ft. Interval Bottom: 7788 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/24/2009 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/25/2011 | | Treatment Summary: | SET SAND PLUG @ 7580 | | Formation Treatment | | Treatment Date: | 8/12/2009 | | Treatment Summary: | Frac J-sand Down 4.5" csg w/167,551 gal SW containing 115,740 # 40/70 & 4,000# 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7740 ft. | # Of Holes: | 50 | | Interval Bottom: | 7788 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OG Status: CM - 10/13/2011 Interval Top: 7306 ft. Interval Bottom: 7326 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/23/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/14/2011 | | Treatment Summary: | Re-Frac Codell down 4-1/2" Csg w/ 201,854 gal Slickwater w/ 150,260# 40/70, 4,000# SuperLC. | | Formation Treatment | | Treatment Date: | 5/9/2006 | | Treatment Summary: | 145,364 GALS FLUID & 115,180 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 30 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 2600 | | CALC_MCF_GAS | 78 | | CASING_PRESS | 460 | | GRAVITY_OIL | 48 | | MCF_GAS | 78 |
| | Perforation Data: | | Interval Top: | 7306 ft. | # Of Holes: | 60 | | Interval Bottom: | 7326 ft. | Hole Size: | 0.45 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 9/25/2009 Interval Top: 7306 ft. Interval Bottom: 7788 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 8/24/2009 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/12/2009 | | Treatment Summary: | J SAND recomplete. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/25/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 5 | | BTU_GAS | 1149 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 33800 | | CALC_MCF_GAS | 169 | | CASING_PRESS | 550 | | GRAVITY_OIL | 50 | | MCF_GAS | 169 |
| | Perforation Data: | | Interval Top: | 7306 ft. | # Of Holes: | 110 | | Interval Bottom: | 7788 ft. | Hole Size: | 0.45 in. |
|
Formation NB-CD Formation Classification: OW Status: TA - 5/1/2025 Interval Top: 7100 ft. Interval Bottom: 7326 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/23/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/14/2011 | | Treatment Summary: | CDRF-NBREC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 25 | | BTU_GAS | 1144 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 3960 | | CALC_MCF_GAS | 99 | | CASING_PRESS | 1396 | | GRAVITY_OIL | 50 | | MCF_GAS | 99 | | TUBING_PRESS | 787 |
| | Perforation Data: | | Interval Top: | 7100 ft. | # Of Holes: | 120 | | Interval Bottom: | 7326 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 10/14/2011 Interval Top: 7100 ft. Interval Bottom: 7188 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/23/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/14/2011 | | Treatment Summary: | Frac Niobrara B & C down 4-1/2" Csg w/ 750 gal 15% HCl & 222,209 gal Slickwater w/ 157,120# 40/70, 4,000# SuperLC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7100 ft. | # Of Holes: | 60 | | Interval Bottom: | 7188 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 11/19/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (TA ) | Y | Defined Inactive 08/31/2024 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|