Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23380
Well Classification: OW Status: PA - 10/6/2022
Well Name/No:WELLS RANCH #34-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/6/2022
FacilityID:281286LocationID:305708
County:WELD #123Location:SWSE 14 5N63W 6
Field:WATTENBERG - #90750Elevation:4630 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:670FSL  1920 FELLat/Long: 40.393736 / -104.400970Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.393830 / -104.401280Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/6/2022             Measured TD: 6772 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/6/2022
Wellbore Permit
Permit #:20053745 Expiration Date:11/13/2006
Proposed Depth/Form:7695 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2SE4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED
Cement:Sacks: 225, Top: 3195 ft., Bottom: 6195 ft.

Wellbore Completed
Completion Date:12/14/2005
Spud Date:12/11/2005Spud Date Is:ACTUAL
Measured TD:6772 ft.Measured PB depth:6742 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY,COMPENSATED NEUTRON,DUAL INDUCTION,CBL, CCL, GR
Casing:String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 403 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 403 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6742 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 5945 ft., Bottom: 6742 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6742 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 2950 ft., Bottom: 5945 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3455 ft.NN
SUSSEX3855 ft.NN
SHANNON4305 ft.NN
NIOBRARA6307 ft.NN
FORT HAYS6519 ft.NN
CODELL6566 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/8/2022                  Interval Top: 6565 ft.    Interval Bottom: 6573 ft.

 Completed Information for Formation CODELL
1st Production Date:3/10/2006Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/30/2005
Treatment Summary:BJ SERVICES FRACED USING 2562 BBL OF 20# VISTAR GEL, 218,000# OF 20/40 FRAC SAND,AND 8000# OF SUPER LC 20/40 RESIN COATED SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 24
BTU_GAS 1394
CALC_BBLS_H2O 1
CALC_BBLS_OIL 24
CALC_GOR 1000
CALC_MCF_GAS 24
CASING_PRESS 1200
GRAVITY_OIL 44
MCF_GAS 24
TUBING_PRESS 1050
Perforation Data:
Interval Top:6565 ft.# Of Holes:24
Interval Bottom:6573 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/6/2022                 Interval Top: 6398 ft.    Interval Bottom: 6573 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/15/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/14/2005
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 9
BTU_GAS 1340
CALC_BBLS_H2O 0
CALC_BBLS_OIL 9
CALC_GOR 4667
CALC_MCF_GAS 42
CASING_PRESS 700
GRAVITY_OIL 42
MCF_GAS 42
TUBING_PRESS 650
Perforation Data:
Interval Top:6398 ft.# Of Holes:54
Interval Bottom:6573 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/8/2022                  Interval Top: 6398 ft.    Interval Bottom: 6408 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/15/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/4/2008
Treatment Summary:FRAC'D NIOBRARA WITH 1000 GALLONS OF 15% HCL, 1524 BBLS SLICKWATER PAD, 393 BBLS OF VISTAR 18# PAD, 2571 BBLS OF VISTAR 18# FLUID SYSTEM, 241080 LBS 30/50 WHITE SAND AND 12640 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6398 ft.# Of Holes:30
Interval Bottom:6408 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/06/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No