Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23326
Well Classification: OW Status: PA - 10/4/2021
Well Name/No:MOSER #11-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/4/2021
FacilityID:280881LocationID:336258
County:WELD #123Location:NESW 28 3N65W 6
Field:WATTENBERG - #90750Elevation:4833 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FSL  1980 FWLLat/Long: 40.194537 / -104.670857Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.194610 / -104.670830Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/4/2021             Measured TD: 7345 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/4/2021
Wellbore Permit
Permit #:20053563 Expiration Date:10/24/2006
Proposed Depth/Form:7345 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SW4

Wellbore Completed
Completion Date:1/22/2006
Spud Date:1/16/2006Spud Date Is:ACTUAL
Measured TD:7345 ft.Measured PB depth:7295 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CNLD, CBL, AIL, PEML, PECL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 716 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 505, Top: 0 ft., Bottom: 716 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7327 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 4090 ft., Bottom: 7327 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4253 ft.NN
NIOBRARA6896 ft.NN
FORT HAYS7160 ft.NN
CODELL7182 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/9/2009                 Interval Top: 7184 ft.    Interval Bottom: 7198 ft.

 Completed Information for Formation CODELL
1st Production Date:2/13/2006Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/9/2006
Treatment Summary:NO ADDITIONAL TREATMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 24
CALC_BBLS_H2O 0
CALC_BBLS_OIL 24
CALC_GOR 10500
CALC_MCF_GAS 252
CASING_PRESS 269
GRAVITY_OIL 53
MCF_GAS 252
Perforation Data:
Interval Top:7184 ft.# Of Holes:56
Interval Bottom:7198 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/4/2021                 Interval Top: 6898 ft.    Interval Bottom: 7198 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/2/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/22/2006
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1288
CALC_BBLS_OIL 10
CALC_GOR 11600
CALC_MCF_GAS 116
CASING_PRESS 1380
GRAVITY_OIL 56
TUBING_PRESS 1950
Perforation Data:
Interval Top:6898 ft.# Of Holes:120
Interval Bottom:7198 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 12/9/2009                 Interval Top: 6898 ft.    Interval Bottom: 7062 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/2/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/26/2009
Treatment Summary:500 GAL 15% HCL & 239,988 GAL SW W/200,260# 40/70 & 4,000# 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6898 ft.# Of Holes:64
Interval Bottom:7062 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/04/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No