Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23284
Well Classification: GW Status: PA - 5/1/2025
Well Name/No:WEBBER #9-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/1/2025
FacilityID:280448LocationID:332685
County:WELD #123Location:NESE 3 3N66W 6
Field:WATTENBERG - #90750Elevation:4840 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2170FSL  750 FELLat/Long: 40.252636 / -104.756600Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.252674 / -104.756530Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/27/2011
End Date: 10/27/2011
Reported: 12/7/2011
Prior to rule 205A.b.(2)(A)
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 5/1/2025             Measured TD: 7479 ft.    Vertical TD: 7461 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20053188 Expiration Date:10/3/2006
Proposed Top PZ Location:Sec:3 Twp: 3N 66W Footage: 2123 FSL  517 FEL
Bottom Hole Location:Sec:3 Twp: 3N 66W Footage: 2123 FSL  517 FEL
Proposed Depth/Form:7468 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2SE

Wellbore Completed
Completion Date:11/26/2005
Spud Date:11/20/2005Spud Date Is:ACTUAL
Measured TD:7479 ft.Measured PB depth:7432 ft.
True Vertical TD:7461 ft.True Vertical PB depth:7414 ft.
Top PZ Location:Sec:3 Twp: 3N 66WFootage: 2136 FSL  535 FEL
Bottom Hole Location:Sec:3 Twp: 3N 66WFootage: 2136 FSL  535 FEL
Log Types:CDNL, CBL, PEML, PECL, AILC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 581 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 0 ft., Bottom: 581 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7464 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 3317 ft., Bottom: 7464 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4254 ft.NN
NIOBRARA7029 ft.NN
FORT HAYS7289 ft.NN
CODELL7313 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/12/2011                Interval Top: 7312 ft.    Interval Bottom: 7330 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/7/2005
Treatment Summary:01/16/2008 TEMPORARY SHUT-IN FOR NBRR RECOMPLETE. BP @7290, 2 SX CEMENT. REMOVED TO COMMINGLE.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 8
CALC_BBLS_H2O 0
CALC_BBLS_OIL 8
CALC_GOR 32500
CALC_MCF_GAS 260
CASING_PRESS 512
GRAVITY_OIL 59
MCF_GAS 260
TUBING_PRESS 165
Perforation Data:
Interval Top:7312 ft.# Of Holes:54
Interval Bottom:7330 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/1/2025                  Interval Top: 7034 ft.    Interval Bottom: 7330 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/17/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/27/2011
Treatment Summary:REPERF CDL (10/17/2011) 7312-7330 HOLES 36 SIZE .38 Re-Frac Codell down 4-1/2" Csg w/ 276,990 gal Slickwater w/ 207,600# 40/70, 4,000# SB Excel.
Formation Treatment
Treatment Date:4/14/2008
Treatment Summary:DRILL OUT PLUG & PUSH TO 7420'. CODL PERFS 12/6/05 > 312-7330 (3 SPF)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/9/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 5
BTU_GAS 1213
CALC_BBLS_H2O 0
CALC_BBLS_OIL 5
CALC_GOR 21800
CALC_MCF_GAS 109
CASING_PRESS 817
GRAVITY_OIL 65
MCF_GAS 109
TUBING_PRESS 800
Perforation Data:
Interval Top:7034 ft.# Of Holes:242
Interval Bottom:7330 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/4/2008                  Interval Top: 7034 ft.    Interval Bottom: 7240 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/29/2008Choke Size:0.188 in.
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/24/2008
Treatment Summary:PERF NBRR> 7034-7060', 7106-7124', 7190-7202', & 7220-7240' (ALL 2 SPF). FRAC NBRR A & B W/274,470 GAL FLUID & 260,000# 40/70 SAND. FRAC NBRR C W/86,822 GAL FLUID & 38,000 30/50 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/4/2008Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1217
CALC_BBLS_H2O 0
CALC_BBLS_OIL 3
CALC_GOR 56667
CALC_MCF_GAS 170
CASING_PRESS 1200
GRAVITY_OIL 51
Perforation Data:
Interval Top:7034 ft.# Of Holes:152
Interval Bottom:7240 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/01/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No