Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23244
Well Classification: GW Status: PA - 11/22/2024
Well Name/No:FRICO #21-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/22/2024
FacilityID:280135LocationID:332632
County:WELD #123Location:SWNE 14 3N65W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Planned Location:1371FNL  1320 FELLat/Long: 40.228807 / -104.625596Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.228740 / -104.625640Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/22/2024             Measured TD: 7502 ft.    Vertical TD: 7270 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/22/2024
Wellbore PermitDIRECTIONAL
Permit #:20052958 Expiration Date:9/18/2006
Proposed Top PZ Location:Sec:14 Twp: 3N 65W Footage: 1347 FNL  2597 FEL
Bottom Hole Location:Sec:14 Twp: 3N 65W Footage: 1347 FNL  2597 FEL
Proposed Depth/Form:7828 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: E/2NE

Wellbore Completed
Completion Date:11/21/2005
Spud Date:11/16/2005Spud Date Is:ACTUAL
Measured TD:7502 ft.Measured PB depth:7472 ft.
True Vertical TD:7270 ft.True Vertical PB depth:7240 ft.
Top PZ Location:Sec:14 Twp: 3N 65WFootage: 1347 FNL  2597 FEL
Bottom Hole Location:Sec:14 Twp: 3N 65WFootage: 1347 FNL  2597 FEL
Log Types:CNLD, CBL, AIL, MICROLOG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 721 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 505, Top: 0 ft., Bottom: 721 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7503 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 565, Top: 3222 ft., Bottom: 7503 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4377 ft.NN
NIOBRARA6824 ft.NN
FORT HAYS7079 ft.NN
CODELL7102 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  AB - 11/22/2024                Interval Top: 7332 ft.    Interval Bottom: 7344 ft.

 Completed Information for Formation CODELL
1st Production Date:12/5/2005Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/1/2005
Treatment Summary:143,248 GALS FLUID & 100,100 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 15
CALC_BBLS_H2O 0
CALC_BBLS_OIL 15
CALC_GOR 12000
CALC_MCF_GAS 180
CASING_PRESS 774
GRAVITY_OIL 59
MCF_GAS 180
TUBING_PRESS 595
Perforation Data:
Interval Top:7332 ft.# Of Holes:48
Interval Bottom:7344 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/22/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No