Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23144
Well Classification: OW Status: PA - 5/10/2024
Well Name/No:SCHMERGE #43-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/10/2024
FacilityID:279123LocationID:305555
County:WELD #123Location:NESE 4 5N67W 6
Field:WATTENBERG - #90750Elevation:4890 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2042FSL  658 FELLat/Long: 40.426843 / -104.889956Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.426920 / -104.890140Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/10/2012
End Date: 10/10/2012
Reported: 12/7/2012
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 5/10/2024             Measured TD: 7410 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 5/10/2024
Wellbore PermitDRIFTED
Permit #:20052305 Expiration Date:8/1/2006
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2SE4

Wellbore Completed
Completion Date:8/24/2005
Spud Date:8/20/2005Spud Date Is:ACTUAL
Measured TD:7410 ft.Measured PB depth:7370 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY, COMPENSATED NEUTRON, DUAL INDUCTION, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 485, Top: 0 ft., Bottom: 1300 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7385 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1020, Top: 166 ft., Bottom: 7385 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1470 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 267, Top: 166 ft., Bottom: 1470 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3550 ft.NN
SUSSEX4038 ft.NN
SHANNON4597 ft.NN
NIOBRARA6879 ft.NN
FORT HAYS7153 ft.NN
CODELL7192 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/3/2013                  Interval Top: 7194 ft.    Interval Bottom: 7204 ft.

 Completed Information for Formation CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/15/2005
Treatment Summary:BJ SERVICES FRACED USING 2678 BBL OF 20# VISTAR GEL, 217,580# OF 20/40 FRAC SAND AND 8000# OF SUPER LC 20/40 RESIN COATED SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7189 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 17
BTU_GAS 1361
CALC_BBLS_H2O 2
CALC_BBLS_OIL 17
CALC_GOR 4529
CALC_MCF_GAS 77
CASING_PRESS 500
GRAVITY_OIL 47
MCF_GAS 77
TUBING_PRESS 350
Perforation Data:
Interval Top:7194 ft.# Of Holes:24
Interval Bottom:7204 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 5/10/2024                 Interval Top: 6902 ft.    Interval Bottom: 7204 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/26/2012Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 37
BBLS_OIL 23
BTU_GAS 1277
CALC_BBLS_H2O 37
CALC_BBLS_OIL 23
CALC_GOR 130
CALC_MCF_GAS 3
CASING_PRESS 881
GRAVITY_OIL 48
MCF_GAS 3
TUBING_PRESS 606
Perforation Data:
Interval Top:6902 ft.# Of Holes:52
Interval Bottom:7204 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/4/2013                  Interval Top: 6092 ft.    Interval Bottom: 7026 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/12/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/8/2012Treatment End Date:10/8/2012
Treatment Summary:Niobrara ""B"" Bench @ 7018'-7026' Niobrara ""A"" Bench @ 6902' - 6904'
Total fluid used in treatment (bbls):2265Max pressure during treatment (psi):4998
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.63
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2265Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7189 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6092 ft.# Of Holes:28
Interval Bottom:7026 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/10/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No