|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 5/10/2024 Measured TD: 7410 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 5/10/2024 | | Wellbore Permit | DRIFTED | | Permit #: | 20052305 | Expiration Date: | 8/1/2006 | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2SE4 |
| | |
| Wellbore Completed | | Completion Date: | 8/24/2005 | | Spud Date: | 8/20/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 7410 ft. | Measured PB depth: | 7370 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY, COMPENSATED NEUTRON, DUAL INDUCTION, CBL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 485, Top: 0 ft., Bottom: 1300 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7385 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1020, Top: 166 ft., Bottom: 7385 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1470 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 267, Top: 166 ft., Bottom: 1470 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3550 ft. | | N | N | | SUSSEX | 4038 ft. | | N | N | | SHANNON | 4597 ft. | | N | N | | NIOBRARA | 6879 ft. | | N | N | | FORT HAYS | 7153 ft. | | N | N | | CODELL | 7192 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 1/3/2013 Interval Top: 7194 ft. Interval Bottom: 7204 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/12/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/15/2005 | | Treatment Summary: | BJ SERVICES FRACED USING 2678 BBL OF 20# VISTAR GEL, 217,580# OF 20/40 FRAC SAND AND 8000# OF SUPER LC 20/40 RESIN COATED SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7189 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 17 | | BTU_GAS | 1361 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 4529 | | CALC_MCF_GAS | 77 | | CASING_PRESS | 500 | | GRAVITY_OIL | 47 | | MCF_GAS | 77 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7194 ft. | # Of Holes: | 24 | | Interval Bottom: | 7204 ft. | Hole Size: | 0.40625 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/10/2024 Interval Top: 6902 ft. Interval Bottom: 7204 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/12/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/26/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 37 | | BBLS_OIL | 23 | | BTU_GAS | 1277 | | CALC_BBLS_H2O | 37 | | CALC_BBLS_OIL | 23 | | CALC_GOR | 130 | | CALC_MCF_GAS | 3 | | CASING_PRESS | 881 | | GRAVITY_OIL | 48 | | MCF_GAS | 3 | | TUBING_PRESS | 606 |
| | Perforation Data: | | Interval Top: | 6902 ft. | # Of Holes: | 52 | | Interval Bottom: | 7204 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 3/4/2013 Interval Top: 6092 ft. Interval Bottom: 7026 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/12/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/8/2012 | Treatment End Date: | 10/8/2012 | | Treatment Summary: | Niobrara ""B"" Bench @ 7018'-7026' Niobrara ""A"" Bench @ 6902' - 6904' | | Total fluid used in treatment (bbls): | 2265 | Max pressure during treatment (psi): | 4998 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.63 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.94 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 2265 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 251500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7189 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6092 ft. | # Of Holes: | 28 | | Interval Bottom: | 7026 ft. | Hole Size: | 0.421875 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/10/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|