|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2025 Measured TD: 8026 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2025 | | Wellbore Permit | | | Permit #: | 20062810 | Expiration Date: | 6/27/2007 | | Proposed Depth/Form: | 8064 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5300 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 4100 ft., Bottom: 5300 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/21/2007 | | Spud Date: | 3/16/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8026 ft. | Measured PB depth: | 8004 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL,DUAL IND/COMPENSATED DEN/COMP NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 908 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 908 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8002 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 6436 ft., Bottom: 8002 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5508 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 4030 ft., Bottom: 5524 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4158 ft. | | N | N | | NIOBRARA | 7187 ft. | | N | N | | CODELL | 7462 ft. | | N | N | | J SAND | 7921 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 7942 ft. Interval Bottom: 7976 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/28/2007 | | Treatment Summary: | JSND COMPLETION FRAC'D THE JSND WITH 172,720 GAL FRAC FLUID AND 238,400# 20/40 SAND. 3/28/07. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7942 ft. | # Of Holes: | 68 | | Interval Bottom: | 7976 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/25/2011 Interval Top: 7240 ft. Interval Bottom: 7976 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/1/2011 | | Treatment Summary: | CIBP SET AT 7350' AND 7515' ON 06/15/2011; DRILLED OUT 6/23/2011. PRODUCTION TUBING 2-3/8 @ 7921'. COMMINGLED ON 6/26/11. | | Formation Treatment | | Treatment Date: | 3/21/2007 | | Treatment Summary: | JSND/NBRR/CODL COMMINGLE. DRLD OUT RBP @ 7350' & 7900' TO COMMINGLE THE JSND/NBRR/CODL. 6/25/2007. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7921 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/1/2011 | Test Method: | FLOWING | | Hours Tested: | 14 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 22 | | BBLS_OIL | 9 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 38 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 5527 | | CALC_MCF_GAS | 233 | | CASING_PRESS | 552 | | GRAVITY_OIL | 51 | | MCF_GAS | 136 | | TUBING_PRESS | 271 |
| | Perforation Data: | | Interval Top: | 7240 ft. | # Of Holes: | 164 | | Interval Bottom: | 7976 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 12/1/2025 Interval Top: 7240 ft. Interval Bottom: 7480 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/15/2011 | | Treatment Summary: | NIOBRARA 7240'-7256' FRAC'D W/250,880 SAND IN 138,054 GAL FRAC FLUID 06/15/2011. CODELL 7464'-7480' FRAC'D W/250,940 SAND IN 121,086 GAL FRAC FLUID 06/15/2011. | | Formation Treatment | | Treatment Date: | 4/20/2007 | | Treatment Summary: | NB-CD REOMPLETION SET CFP @ 7900'. 4/17/07, FRAC'D THE CODL WITH 109,534 GAL FRAC FLUID AND 250,860# SAND. 4/20/07, SET CFP@7350'.,FRAC'D THE NBRR WITH 163,590 GAL FRAC FLUID AND 250,340# |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 17 | | BBLS_OIL | 55 | | CALC_BBLS_H2O | 17 | | CALC_BBLS_OIL | 55 | | CALC_GOR | 5527 | | CALC_MCF_GAS | 304 | | CASING_PRESS | 442 | | MCF_GAS | 304 |
| | Perforation Data: | | Interval Top: | 7240 ft. | # Of Holes: | 96 | | Interval Bottom: | 7480 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 214 |
| Total Gas Produced (MCF) | 6293 |
| GOR | 29406 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.556 |
| Average MCFE per Day | 20.636 |
| Federal Financial Assurance | i | |
|
|