|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/17/2023 Measured TD: 8711 ft. Vertical TD: 8513 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/17/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20062449 | Expiration Date: | 6/26/2007 | | Proposed Top PZ Location: | Sec:20 Twp: 1N 68W | Footage: 1995 FSL 1997 FEL | | Bottom Hole Location: | Sec:20 Twp: 1N 68W | Footage: 1995 FSL 1997 FEL | | Proposed Depth/Form: | 8681 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5500 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 4200 ft., Bottom: 5500 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/3/2006 | | Spud Date: | 6/22/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 8711 ft. | Measured PB depth: | 8689 ft. | | True Vertical TD: | 8513 ft. | True Vertical PB depth: | 8491 ft. | | Top PZ Location: | Sec:20 Twp: 1N 68W | Footage: 1995 FSL 1997 FEL | | Bottom Hole Location: | Sec:20 Twp: 1N 68W | Footage: 1995 FSL 1997 FEL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMP NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 932 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 395, Top: 0 ft., Bottom: 932 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8692 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 7033 ft., Bottom: 8692 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4974 ft. | | N | N | | SHANNON | 5471 ft. | | N | N | | NIOBRARA | 7734 ft. | | N | N | | CODELL | 8149 ft. | | N | N | | J SAND | 8589 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 3/21/2023 Interval Top: 8600 ft. Interval Bottom: 8620 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/13/2006 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/9/2006 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE J SAND (8600' - 8620' WITH 165,745 GAL FRAC FLUID & 250,080# SAND. 7/9/06 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8600 ft. | # Of Holes: | 40 | | Interval Bottom: | 8620 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 1/26/2023 Interval Top: 8150 ft. Interval Bottom: 8170 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/8/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8150 ft. | # Of Holes: | 80 | | Interval Bottom: | 8170 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/10/2006 Interval Top: 7742 ft. Interval Bottom: 8620 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 8/8/2006 | Choke Size: | 0.250 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/3/2006 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7860' ON 8/3/06 & CFP @ 8270' ON 8/6/06 TO COMMINGLE THE JSND-NBRR-CDL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8558 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/10/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 80 | | BBLS_OIL | 28 | | CALC_BBLS_H2O | 80 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 14357 | | CALC_MCF_GAS | 402 | | CASING_PRESS | 1200 | | MCF_GAS | 402 | | TUBING_PRESS | 500 |
| | Perforation Data: | | Interval Top: | 7742 ft. | # Of Holes: | 240 | | Interval Bottom: | 8620 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/21/2023 Interval Top: 7742 ft. Interval Bottom: 8170 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/8/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/9/2006 | | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP @8270'. FRAC'D THE CODELL (8150'-8710') W/113,396 FAL FRAC FLUID AND 250,080# SAND. SET CFP @7860. FRAC'D THE NBRR (7742'-7762') W/167,400 GAL FRAC FLUID & 250,140# SAND. 7/9/06 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7742 ft. | # Of Holes: | 200 | | Interval Bottom: | 8170 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/26/2023 Interval Top: 7742 ft. Interval Bottom: 7762 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/8/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7742 ft. | # Of Holes: | 120 | | Interval Bottom: | 7762 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/21/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|