|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/27/2015 Measured TD: 8325 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/27/2015 | | Wellbore Permit | | | Permit #: | 20051533 | Expiration Date: | 5/19/2006 | | Proposed Depth/Form: | 8307 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5400 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 4100 ft., Bottom: 5400 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/4/2005 | | Spud Date: | 5/28/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 8325 ft. | Measured PB depth: | 8304 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DUAL INDUCTION, COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 815 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 815 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8321 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 7885 ft., Bottom: 8321 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5102 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 305, Top: 3880 ft., Bottom: 5102 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4440 ft. | | N | N | | SHANNON | 5007 ft. | | N | N | | NIOBRARA | 7373 ft. | | N | N | | FORT HAYS | 7713 ft. | | N | N | | CODELL | 7736 ft. | | N | N | | MOWRY | 8150 ft. | | N | N | | J SAND | 8164 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/27/2015 Interval Top: 8165 ft. Interval Bottom: 8198 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/4/2005 | | Treatment Summary: | FRAC'D THE JSND (8165-8171' AND 8180-8198') WITH 187,770 GAL FRAC FLUID AND 300,460# SAND, 6/16/05 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8165 ft. | # Of Holes: | 48 | | Interval Bottom: | 8198 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/7/2005 Interval Top: 7490 ft. Interval Bottom: 8198 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/4/2005 | | Treatment Summary: | DRILLED UP CBP @ 7620'. DRILLED UP CBP @ 7900' TO COMMINGLE, 10/4/05 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8154 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/7/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 128 | | BBLS_OIL | 56 | | CALC_BBLS_H2O | 128 | | CALC_BBLS_OIL | 56 | | CALC_GOR | 5196 | | CALC_MCF_GAS | 291 | | CASING_PRESS | 1141 | | MCF_GAS | 291 | | TUBING_PRESS | 498 |
| | Perforation Data: | | Interval Top: | 7490 ft. | # Of Holes: | 240 | | Interval Bottom: | 8198 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/27/2015 Interval Top: 7490 ft. Interval Bottom: 7754 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/16/2005 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/4/2005 | | Treatment Summary: | SET CBP @ 7900', 7/24/05. FRAC'D CODL (7736-7754') W/ 130,400 GAL FRAC FLUID, 288,340# 20/40, 8/31/05 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7490 ft. | # Of Holes: | 192 | | Interval Bottom: | 7754 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/27/2015 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|