Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22896
Well Classification: GW Status: SI - 6/1/2022
Well Name/No:CANNON #3-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2022
FacilityID:277081LocationID:305387
County:WELD #123Location:NENW 11 2N66W 6
Field:WATTENBERG - #90750Elevation:5060 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:500FNL  1800 FWLLat/Long: 40.158377 / -104.747389Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.158630 / -104.747380Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 6/1/2022             Measured TD: 8093 ft.    Vertical TD: 8093 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 6/1/2022
Wellbore Permit
Permit #:20062754 Expiration Date:7/20/2007
Proposed Depth/Form:8093 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 984 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 690, Top: 0 ft., Bottom: 984 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8088 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 3581 ft., Bottom: 8088 ft.

Wellbore Completed
Completion Date:5/5/2005
Spud Date:4/14/2005Spud Date Is:ACTUAL
Measured TD:8093 ft.Measured PB depth:8073 ft.
True Vertical TD:8093 ft.True Vertical PB depth:8073 ft.
Log Types:CBL, DIGL, GR, CDCN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 984 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 984 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8088 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 3581 ft., Bottom: 8088 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4531 ft.NN
NIOBRARA7216 ft.NN
FORT HAYS7462 ft.NN
CODELL7486 ft.NN
J SAND7935 ft.NN

Formation JSND                     Formation Classification:  OG                     Status:  SI - 6/1/2022                  Interval Top: 7936 ft.    Interval Bottom: 7992 ft.

 Completed Information for Formation J SAND
1st Production Date:11/20/2006Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/22/2011
Treatment Summary:CIBP SET @ 7600. These are TA’d for a pressure monitoring test being done to estimate the drainage volume of a horizontal well.
Formation Treatment
Treatment Date:4/1/2011
Treatment Summary:REMOVED CIBP SET @ 7451'
Formation Treatment
Treatment Date:11/9/2006
Treatment Summary:PERF & FRAC JSND W/ 161,658 GALS FLUID & 120,900# 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7936 ft.# Of Holes:98
Interval Bottom:7992 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/27/2011                 Interval Top: 7486 ft.    Interval Bottom: 7502 ft.

 Completed Information for Formation CODELL
1st Production Date:5/13/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/2011
Treatment Summary:REMOVED CIBP SET @ 7451'
Formation Treatment
Treatment Date:5/5/2005
Treatment Summary:138721 GAL FLUID FRAC INFO REPRESENTS: CODL 115320 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 38
CALC_BBLS_OIL 38
CALC_GOR 2950
CALC_MCF_GAS 112
CASING_PRESS 555
GRAVITY_OIL 50
MCF_GAS 112
TUBING_PRESS 248
Perforation Data:
Interval Top:7486 ft.# Of Holes:48
Interval Bottom:7502 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 4/24/2011                 Interval Top: 7260 ft.    Interval Bottom: 7992 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:4/6/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/2011
Treatment Summary:CIBP REMOVED AT 7451' TO COMMINGLE WITH NB.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/24/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 10
BTU_GAS 1286
CALC_BBLS_OIL 10
CALC_GOR 6000
CALC_MCF_GAS 60
CASING_PRESS 665
GRAVITY_OIL 52
MCF_GAS 60
Perforation Data:
Interval Top:7260 ft.# Of Holes:212
Interval Bottom:7992 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OG                   Status:  SI - 6/1/2022                  Interval Top: 7260 ft.    Interval Bottom: 7992 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/6/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/15/2012
Treatment Summary:HYDRAULIC PACKERS SET @ 7215-7250, 7279-7319, AND 7400-7502.
Formation Treatment
Treatment Date:4/1/2011
Treatment Summary:CIBP REMOVED AT 7451' TO COMMINGLE ALL NB-CD/JSND PRODUCTION.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_OIL 1
BTU_GAS 1286
CALC_BBLS_OIL 1
CALC_GOR 5000
CALC_MCF_GAS 5
CASING_PRESS 775
GRAVITY_OIL 52
MCF_GAS 5
TUBING_PRESS 785
Perforation Data:
Interval Top:7260 ft.# Of Holes:212
Interval Bottom:7992 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 4/27/2011                 Interval Top: 7260 ft.    Interval Bottom: 7364 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/30/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/2011
Treatment Summary:REMOVED CIBP SET @ 7451' ABOVE CODELL AND JSND TO COMMINGLE WITH NB.
Formation Treatment
Treatment Date:4/9/2007
Treatment Summary:PERF & FRAC NBRR W/ 178,354 GALS FLUID & 200,000# 30/50 SAND 7260-7282 (1 SPF) 7320-7364 (1SPF)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BTU_GAS 1295
CALC_BBLS_OIL 8
CALC_GOR 10875
CALC_MCF_GAS 87
CASING_PRESS 450
GRAVITY_OIL 54
TUBING_PRESS 320
Perforation Data:
Interval Top:7260 ft.# Of Holes:66
Interval Bottom:7364 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 7/1/2012

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/20/2006
Treatment Summary:CODL PERFS 05/04/2005 7486-7502
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 9
CALC_GOR 17222
CALC_MCF_GAS 155
CASING_PRESS 700
GRAVITY_OIL 51
TUBING_PRESS 350
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
03/31/2022
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No