Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22885
Well Classification: OW Status: SI - 3/1/2022
Well Name/No:DOLPH #12-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2022
FacilityID:277054LocationID:305377
County:WELD #123Location:NWSW 1 2N66W 6
Field:WATTENBERG - #90750Elevation:5040 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1988FSL  665 FWLLat/Long: 40.165377 / -104.732898Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.165600 / -104.732540Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 3/1/2022             Measured TD: 8095 ft.    Vertical TD: 8095 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 3/1/2022
Wellbore Permit
Permit #:20064476 Expiration Date:10/9/2007
Proposed Depth/Form:8095 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2SW
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 665, Top: 0 ft., Bottom: 950 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8090 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 800, Top: 4406 ft., Bottom: 8090 ft.

Wellbore Completed
Completion Date:5/23/2005
Spud Date:4/24/2005Spud Date Is:ACTUAL
Measured TD:8095 ft.Measured PB depth:8073 ft.
True Vertical TD:8095 ft.True Vertical PB depth:8073 ft.
Log Types:CBL, GR, CDCN, DIGL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 950 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 665, Top: 0 ft., Bottom: 950 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8090 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 4406 ft., Bottom: 8090 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4613 ft.NN
NIOBRARA7192 ft.NN
FORT HAYS7448 ft.NN
CODELL7471 ft.NN
J SAND7919 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  SI - 3/1/2022                  Interval Top: 7920 ft.    Interval Bottom: 7980 ft.

 Completed Information for Formation J SAND
1st Production Date:8/29/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/31/2011
Treatment Summary:See comment on Submit Tab
Formation Treatment
Treatment Date:2/8/2007
Treatment Summary:CIBP OVER CD/J @ 7435'. TWO SKS CMT PLACED ON TOP OF CIBP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP AND COMMINGLE WITH NB W/N NEXT 6 MONTHS.
Tubing Size:2.375 in.Tubing Setting Depth:7894 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 31
BTU_GAS 1282
CALC_BBLS_OIL 31
CALC_GOR 839
CALC_MCF_GAS 26
CASING_PRESS 868
GRAVITY_OIL 48
MCF_GAS 26
TUBING_PRESS 708
Perforation Data:
Interval Top:7920 ft.# Of Holes:112
Interval Bottom:7980 ft.Hole Size:0.45 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/11/2011                Interval Top: 7472 ft.    Interval Bottom: 7490 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/23/2005
Treatment Summary:CIBP OVER CD/J @ 7435'. TWO SKS CMT PLACED ON TOP OF CIBP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP AND COMMINGLE WITH NB W/N NEXT 6 MONTHS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 39
CALC_BBLS_H2O 0
CALC_BBLS_OIL 39
CALC_GOR 3750
CALC_MCF_GAS 146
CASING_PRESS 680
GRAVITY_OIL 52
MCF_GAS 146
TUBING_PRESS 357
Perforation Data:
Interval Top:7472 ft.# Of Holes:54
Interval Bottom:7490 ft.Hole Size:0.45 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 3/22/2007                 Interval Top: 7472 ft.    Interval Bottom: 7980 ft.

 Completed Information for Formation J-CODELL
1st Production Date:2/27/2007Choke Size:0.500 in.
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/23/2005
Treatment Summary:CODL PERFS 5/19/05 7472-7490
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/22/2007Test Method:FLOWING
Hours Tested:Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1282
CALC_BBLS_OIL 12
CALC_GOR 4167
CALC_MCF_GAS 50
CASING_PRESS 510
GRAVITY_OIL 51
TUBING_PRESS 350
Perforation Data:
Interval Top:7472 ft.# Of Holes:
Interval Bottom:7980 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 3/1/2022                  Interval Top: 7260 ft.    Interval Bottom: 7490 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/29/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/31/2011
Treatment Summary:See comment on Submit Tab
Tubing Size:2.375 in.Tubing Setting Depth:7894 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 31
BTU_GAS 1282
CALC_BBLS_OIL 31
CALC_GOR 839
CALC_MCF_GAS 26
CASING_PRESS 868
GRAVITY_OIL 48
MCF_GAS 26
TUBING_PRESS 708
Perforation Data:
Interval Top:7260 ft.# Of Holes:166
Interval Bottom:7490 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/12/2009                 Interval Top: 7260 ft.    Interval Bottom: 7348 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/27/2009Choke Size:0.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/2009
Treatment Summary:15% HC1 AND 246,099 GAL SW W/201,160# 30/50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7198 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/12/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1282
CALC_BBLS_H2O 0
CALC_BBLS_OIL 9
CALC_GOR 889
CALC_MCF_GAS 48
CASING_PRESS 379
GRAVITY_OIL 48
TUBING_PRESS 291
Perforation Data:
Interval Top:7260 ft.# Of Holes:66
Interval Bottom:7348 ft.Hole Size:0.43 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
12/31/2021
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No