Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22884
Well Classification: GW Status: SI - 4/1/2022
Well Name/No:DOLPH #5-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2022
FacilityID:277477LocationID:305376
County:WELD #123Location:SWNW 1 2N66W 6
Field:WATTENBERG - #90750Elevation:5050 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2160FNL  480 FWLLat/Long: 40.168537 / -104.733538Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.168706 / -104.733250Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/23/2011
End Date: 6/23/2011
Reported: 8/10/2011
Prior to rule 205A.b.(2)(A)
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 4/1/2022             Measured TD: 8119 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 4/1/2022
Wellbore Permit
Permit #:20064984 Expiration Date:11/12/2007
Proposed Depth/Form:8119 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2NW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 945 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 945 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8073 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 800, Top: 4051 ft., Bottom: 8073 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:5/1/2005Spud Date Is:ACTUAL
Measured TD:8119 ft.Measured PB depth:8038 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CNCD, DIGR, CBL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 945 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 945 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8073 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 4051 ft., Bottom: 8073 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 1250 ft., Depth: 8072 ft., Bottom: 4000 ft., Sacks: 750, Method: NON CEMENT SQUEEZE
FormationInterval TopLog BottomCoredDSTs
SUSSEX4494 ft.NN
FORT HAYS7447 ft.NN
CODELL7473 ft.NN
J SAND7929 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  SI - 4/1/2022                  Interval Top: 7930 ft.    Interval Bottom: 7990 ft.

 Completed Information for Formation J SAND
1st Production Date:3/5/2007Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/21/2013Treatment End Date:N/A
Treatment Summary:CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB-CD PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/6/2011
Treatment Summary:SAND PLUG SET @ 8001
Formation Treatment
Treatment Date:2/22/2007
Treatment Summary:J-REC. PERF & FRAC JSND W/160,860 GALS. FLUID & 116,040# 30/50 SAND PERFS 7930-7937 (2SPF) 7946-7973 (2SPF) 7983-7990 (2SPF)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7930 ft.# Of Holes:82
Interval Bottom:7990 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/14/2011                 Interval Top: 7474 ft.    Interval Bottom: 7490 ft.

 Completed Information for Formation CODELL
1st Production Date:7/7/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/23/2011
Treatment Summary:CDL REPERF (6/8/2011) 7476-7490 HOLES 14 SIZE .38 Frac Codell down 4-1/2" Csg w/ 204,498 gal Slickwater w/ 150,280# 40/70, 4,000# SB Excel, 0# .
Formation Treatment
Treatment Date:6/1/2005
Treatment Summary:149749 GAL FLUID FRAC INFO REPRESENTS; CODL 115560 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 20
CALC_BBLS_OIL 20
CALC_GOR 5450
CALC_MCF_GAS 109
CASING_PRESS 500
GRAVITY_OIL 55
MCF_GAS 109
TUBING_PRESS 225
Perforation Data:
Interval Top:7474 ft.# Of Holes:62
Interval Bottom:7490 ft.Hole Size:0.45 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 3/25/2007                 Interval Top: 7474 ft.    Interval Bottom: 7990 ft.

 Completed Information for Formation J-CODELL
1st Production Date:3/5/2007Choke Size:0.375 in.
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/1/2005
Treatment Summary:CODL PERFS 5/31/05 7474-7490
Tubing Size:2.375 in.Tubing Setting Depth:7900 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/25/2007Test Method:FLOWING
Hours Tested:Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1231
CALC_BBLS_OIL 3
CALC_GOR 59000
CALC_MCF_GAS 177
CASING_PRESS 400
GRAVITY_OIL 54
TUBING_PRESS 260
Perforation Data:
Interval Top:7474 ft.# Of Holes:
Interval Bottom:7990 ft.Hole Size:

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 5/30/2013                 Interval Top: 7247 ft.    Interval Bottom: 7990 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:5/24/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/30/2013Treatment End Date:N/A
Treatment Summary:CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB-CD PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7895 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/30/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 1
BTU_GAS 1236
CALC_BBLS_OIL 1
CALC_GOR 16000
CALC_MCF_GAS 16
CASING_PRESS 890
GRAVITY_OIL 52
MCF_GAS 16
TUBING_PRESS 761
Perforation Data:
Interval Top:7247 ft.# Of Holes:144
Interval Bottom:7990 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 4/1/2022                  Interval Top: 7247 ft.    Interval Bottom: 7490 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/7/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/23/2011
Treatment Summary:CDRF-NBREC
Tubing Size:2.375 in.Tubing Setting Depth:7466 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/11/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1257
CALC_GOR 1293
CALC_MCF_GAS 6
CASING_PRESS 513
GRAVITY_OIL 50
MCF_GAS 6
TUBING_PRESS 141
Perforation Data:
Interval Top:7247 ft.# Of Holes:144
Interval Bottom:7490 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/3/2011                  Interval Top: 7247 ft.    Interval Bottom: 7332 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/7/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/23/2011
Treatment Summary:Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 239,190 gal Slickwater w/ 200,440# 40/70, 4,000# SB Excel, 0# .
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7247 ft.# Of Holes:82
Interval Bottom:7332 ft.Hole Size:0.38 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
03/31/2022
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No