Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22873
Well Classification: OW Status: PA - 6/14/2018
Well Name/No:SHUPE 5 SPOT #B10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/14/2018
FacilityID:276937LocationID:332837
Municipality/County:GREELEY / WELD #123Location:NENE 20 5N65W 6
Field:WATTENBERG - #90750Elevation:4669 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:150FNL  874 FELLat/Long: 40.391415 / -104.680999Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.391450 / -104.680970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 5/16/2018             Measured TD: 7600 ft.    Vertical TD: 7324 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 5/16/2018
Wellbore PermitDIRECTIONAL
Permit #:20050595 Expiration Date:4/3/2006
Proposed Top PZ Location:Sec:17 Twp: 5N 65W Footage: 1333 FSL  1328 FEL
Bottom Hole Location:Sec:17 Twp: 5N 65W Footage: 1333 FSL  1328 FEL
Proposed Depth/Form:8040 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE/4

Wellbore Completed
Completion Date:9/22/2005
Spud Date:8/25/2005Spud Date Is:ACTUAL
Measured TD:7600 ft.Measured PB depth:7585 ft.
True Vertical TD:7324 ft.True Vertical PB depth:7309 ft.
Top PZ Location:Sec:17 Twp: 5N 65WFootage: 1295 FSL  1322 FEL
Bottom Hole Location:Sec:17 Twp: 5N 65WFootage: 1295 FSL  1322 FEL
Log Types:DIL, DEN, NEU, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 498 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 0 ft., Bottom: 498 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7588 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 3950 ft., Bottom: 7588 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4518 ft.4615 ft.NN
NIOBRARA7037 ft.7340 ft.NN
CODELL7362 ft.7378 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/24/2009                Interval Top: 7362 ft.    Interval Bottom: 7407 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/2009
Treatment Summary:RE-PERF EXISTING CD 7362-7378, 7402-7407. RE-FRAC CODELL 7362'-7378' W/ 119,994 GAL HYBRID 26# PHASER FRAC AND 250,000# 20/40 SANDS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 33
BTU_GAS 1255
CALC_BBLS_H2O 10
CALC_BBLS_OIL 33
CALC_GOR 11515
CALC_MCF_GAS 380
CASING_PRESS 620
GRAVITY_OIL 57
MCF_GAS 380
Perforation Data:
Interval Top:7362 ft.# Of Holes:84
Interval Bottom:7407 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/14/2018                 Interval Top: 7048 ft.    Interval Bottom: 7407 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/11/2009Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/4/2009
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7321 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/24/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 18
BTU_GAS 1274
CALC_BBLS_H2O 0
CALC_BBLS_OIL 18
CALC_GOR 15722
CALC_MCF_GAS 283
CASING_PRESS 1720
GRAVITY_OIL 62
MCF_GAS 283
Perforation Data:
Interval Top:7048 ft.# Of Holes:364
Interval Bottom:7407 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/24/2009                Interval Top: 7048 ft.    Interval Bottom: 7260 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/3/2009
Treatment Summary:FRAC NIOBRARA B 7178-94'; C 7246-60', W/219,996 GAL HYBRID PHASER FRAC, 53,750 # 40/70 SAND, 240,000# 20/40 SAND. 12/3/2009 FRAC NIOBRARA A 7048-7068', 7082-7092 W/ 109,494 GAL HYBRID PHASER FRAC, 15,000 # 40/70 SAND, 160,000# 20/40 SAND. 12/4/2009
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7048 ft.# Of Holes:240
Interval Bottom:7260 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/14/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No