|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 10/1/2025 Measured TD: 8062 ft. Vertical TD: 8062 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 10/1/2025 | | Wellbore Permit | | | Permit #: | 20043290 | Expiration Date: | 1/23/2006 | | Proposed Depth/Form: | 8055 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SE4 |
| | |
| Wellbore Completed | | Completion Date: | 2/23/2005 | | Spud Date: | 2/8/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 8062 ft. | Measured PB depth: | 8037 ft. | | True Vertical TD: | 8062 ft. | True Vertical PB depth: | 8037 ft. | | Log Types: | CBL, GR, CDCN, DIGL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 992 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 992 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8053 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 4088 ft., Bottom: 8053 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4552 ft. | | N | N | | NIOBRARA | 7108 ft. | | N | N | | FORT HAYS | 7449 ft. | | N | N | | CODELL | 7472 ft. | | N | N | | J SAND | 7926 ft. | | N | N |
Formation JSND Formation Classification: OW Status: TA - 1/1/2017 Interval Top: 7928 ft. Interval Bottom: 7971 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/5/2005 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/21/2011 | | Treatment Summary: | SAND PLUG @ 7693' | | Formation Treatment | | Treatment Date: | 11/22/2005 | | Treatment Summary: | 162,288 GALS FLUID & 115,180 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7928 ft. | # Of Holes: | 105 | | Interval Bottom: | 7971 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/5/2011 Interval Top: 7472 ft. Interval Bottom: 7488 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/20/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/24/2011 | | Treatment Summary: | REPERF CDL (3/21/2011) 7474-7486 HOLES 12 SIZE .42
Re-Frac Codell down 4-1/2" Csg w/ 202,502 gal Slickwater w/ 150,080# 40/70, 4,000# SB Excel. | | Formation Treatment | | Treatment Date: | 2/23/2005 | | Treatment Summary: | CODL 151060 GAL FLUID FRAC INFO REPRESENTS; CODEL 115040 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 28 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 4214 | | CALC_MCF_GAS | 118 | | CASING_PRESS | 441 | | GRAVITY_OIL | 46 | | MCF_GAS | 118 | | TUBING_PRESS | 364 |
| | Perforation Data: | | Interval Top: | 7472 ft. | # Of Holes: | 60 | | Interval Bottom: | 7488 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 2/28/2006 Interval Top: 7472 ft. Interval Bottom: 7971 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 12/5/2005 | Choke Size: | 0.281 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/23/2005 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7893 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 6 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 31500 | | CALC_MCF_GAS | 189 | | CASING_PRESS | 491 | | GRAVITY_OIL | 49 | | MCF_GAS | 189 | | TUBING_PRESS | 352 |
| | Perforation Data: | | Interval Top: | 7472 ft. | # Of Holes: | 153 | | Interval Bottom: | 7971 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 10/1/2025 Interval Top: 7236 ft. Interval Bottom: 7488 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/24/2011 | | Treatment Summary: | CDRF-NBRC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/2/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | BTU_GAS | 1216 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 4667 | | CALC_MCF_GAS | 14 | | CASING_PRESS | 1427 | | GRAVITY_OIL | 48 | | MCF_GAS | 14 | | TUBING_PRESS | 720 |
| | Perforation Data: | | Interval Top: | 7236 ft. | # Of Holes: | 122 | | Interval Bottom: | 7488 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/10/2011 Interval Top: 7236 ft. Interval Bottom: 7330 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/24/2011 | | Treatment Summary: | Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 245,253 gal Slickwater w/ 207,300# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7236 ft. | # Of Holes: | 62 | | Interval Bottom: | 7330 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 2 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.005 |
| Federal Financial Assurance | i | |
|
|