|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/6/2024 Measured TD: 7179 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/6/2024 | | Wellbore Permit | | | Permit #: | 20042861 | Expiration Date: | 12/14/2005 | | Proposed Depth/Form: | 8150 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N2NE4 | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8150 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 225, Top: 3650 ft., Bottom: 6650 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/14/2005 | | Spud Date: | 12/31/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7179 ft. | Measured PB depth: | 7168 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DEN,COMP NEU,DUAL IND,GR,CBL,CCL,VDL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 552 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 552 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7168 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 165, Top: 6216 ft., Bottom: 7168 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7168 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 305, Top: 3340 ft., Bottom: 6216 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 3345 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 455, Top: 0 ft., Bottom: 3345 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 3158 ft. | | N | N | | PARKMAN | 3640 ft. | | N | N | | SUSSEX | 4050 ft. | | N | N | | SHANNON | 4395 ft. | | N | N | | NIOBRARA | 6650 ft. | | N | N | | FORT HAYS | 6922 ft. | | N | N | | CODELL | 6956 ft. | | N | N | | CARLILE | 6988 ft. | | N | N | | GREENHORN | 7021 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 1/16/2024 Interval Top: 6957 ft. Interval Bottom: 6967 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/11/2005 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/31/2011 | | Treatment Summary: | Re-perf'd Codell
Re-Frac'd Codell w/ 595 bbls of 26# pHaser pad, 1983 bbls of 26# pHaser fluid system, 221800# 20/40 Ottawa, 8000# 20/40 SB Excel. | | Formation Treatment | | Treatment Date: | 1/14/2005 | | Treatment Summary: | 1/14/05 B J SERVICES FRACED WITH 2591 BBL OF VISTAR 20# GEL SYSTEM USING 217220# OF 20/40 FRAC SAND AND 8000# OF RESIN COATED SUPER LC 20/40 MESH SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 30 | | BTU_GAS | 1243 | | CALC_GOR | 533 | | CASING_PRESS | 200 | | GRAVITY_OIL | 46 | | MCF_GAS | 16 | | TUBING_PRESS | 180 |
| | Perforation Data: | | Interval Top: | 6957 ft. | # Of Holes: | 48 | | Interval Bottom: | 6967 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/6/2024 Interval Top: 6657 ft. Interval Bottom: 6967 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/22/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 30 | | BTU_GAS | 1292 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 3300 | | CALC_MCF_GAS | 99 | | CASING_PRESS | 1402 | | GRAVITY_OIL | 46 | | MCF_GAS | 99 | | TUBING_PRESS | 257 |
| | Perforation Data: | | Interval Top: | 6657 ft. | # Of Holes: | 76 | | Interval Bottom: | 6967 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 1/16/2024 Interval Top: 6657 ft. Interval Bottom: 6795 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/22/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/31/2011 | | Treatment Summary: | Perf'd Niobrara "A" 6657-6659' (4 holes), Niobrara "B" 6787-6795' (24 holes)
Frac'd Niobrara with 119 bbl FE-1A pad, 1547 bbls of Slickwater pad, 143 bbls of pHaser 20# pad, 2253 bbls of pHaser 20# fluid system and 241000# of 20/42 Ottawa, 12000 # 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6657 ft. | # Of Holes: | 28 | | Interval Bottom: | 6795 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/06/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|