Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22518
Well Classification: GW Status: PA - 6/9/2025
Well Name/No:BARRELL #41-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/9/2025
FacilityID:274328LocationID:305118
County:WELD #123Location:NENE 4 6N64W 6
Field:WATTENBERG - #90750Elevation:4850 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:470FNL  850 FELLat/Long: 40.521074 / -104.548846Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.521140 / -104.548720Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 6/9/2025             Measured TD: 7313 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 6/9/2025
Wellbore Permit
Permit #:20042314 Expiration Date:10/21/2005
Proposed Depth/Form:8215 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8215 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 225, Top: 3715 ft., Bottom: 6715 ft.

Wellbore Completed
Completion Date:1/20/2005
Spud Date:12/13/2004Spud Date Is:ACTUAL
Measured TD:7313 ft.Measured PB depth:7277 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP.,DEN,COMP.NEU,DUAL IND,GR,CBL,CCL,VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 498 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 498 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7277 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 6170 ft., Bottom: 7277 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6170 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 2445 ft., Bottom: 6170 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 600 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 600 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND3015 ft.NN
PARKMAN3733 ft.NN
SUSSEX4115 ft.NN
SHANNON4520 ft.NN
NIOBRARA6762 ft.NN
FORT HAYS7051 ft.NN
CODELL7097 ft.7114 ft.NN
CARLILE7130 ft.NN
GREENHORN7162 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/18/2025                 Interval Top: 7098 ft.    Interval Bottom: 7109 ft.

 Completed Information for Formation CODELL
1st Production Date:2/8/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/17/2017Treatment End Date:N/A
Treatment Summary:Codell Recompletion consisted of: Silica Proppant: 225,000 lbs Total Fluid: 119,658 gals 15% HCl Acid: 1000 gals
Total fluid used in treatment (bbls):Max pressure during treatment (psi):3521
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/20/2005
Treatment Summary:1/20/05 B J SERVICES FRACED WITH 2662 BBL OF VISTAR 20# GEL SYSTEM USING 217380# OF 20/40 FRAC SAND AND 8000# OF RESIN COATED SUPER LC 20/40 MESH
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 2
CALC_GOR 37000
CASING_PRESS 750
GRAVITY_OIL 40
MCF_GAS 74
TUBING_PRESS 600
Perforation Data:
Interval Top:7098 ft.# Of Holes:18
Interval Bottom:7109 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/9/2025                  Interval Top: 6814 ft.    Interval Bottom: 7109 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/6/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6814 ft.# Of Holes:58
Interval Bottom:7109 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/18/2025                 Interval Top: 6814 ft.    Interval Bottom: 7010 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/6/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/17/2017Treatment End Date:N/A
Treatment Summary:Niobrara completion consisted of: Silica proppant: 350,140 lbs Total Fluid: 218,996 gals Acid: 0 gals
Total fluid used in treatment (bbls):Max pressure during treatment (psi):3390
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6814 ft.# Of Holes:40
Interval Bottom:7010 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/09/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)348
Total Gas Produced (MCF)1007
GOR2893
GOR DeterminationBOE
Average BOE per Day1.428
Average MCFE per Day8.273

 Federal Financial Assurance  i 

 Tribal Well  i No