|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 7/24/2024 Measured TD: 7111 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 7/24/2024 | | Wellbore Permit | DRIFTED | | Permit #: | 20041746 | Expiration Date: | 9/1/2005 | | Proposed Depth/Form: | 8055 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NW4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8055 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 3555 ft., Bottom: 6555 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/23/2004 | | Spud Date: | 12/5/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7111 ft. | Measured PB depth: | 7067 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DEN,COMP.NEU,DUAL IND,GR,CMT CBL,CCL,VDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 855 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 865 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7067 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 507, Top: 3410 ft., Bottom: 7067 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3410 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 1166 ft., Bottom: 3410 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2930 ft. | | N | N | | PARKMAN | 3571 ft. | | N | N | | SUSSEX | 3990 ft. | | N | N | | SHANNON | 4240 ft. | | N | N | | NIOBRARA | 6610 ft. | | N | N | | FORT HAYS | 6806 ft. | | N | N | | CODELL | 6898 ft. | | N | N | | CARLILE | 6914 ft. | | N | N | | GREENHORN | 6944 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 2/12/2024 Interval Top: 6900 ft. Interval Bottom: 6910 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/10/2005 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/23/2004 | | Treatment Summary: | 12/23/04 B J SERVICES FRACED WITH 2556 BBL OF VISTAR 20# GEL SYSTEM USING 217820# OF 20/40 FRAC SAND AND 8000# OF RESIN COATED SUPER LC 20/40 MESH SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 83 | | BTU_GAS | 1385 | | CALC_GOR | 2166 | | CASING_PRESS | 600 | | GRAVITY_OIL | 44 | | MCF_GAS | 60 | | TUBING_PRESS | 550 |
| | Perforation Data: | | Interval Top: | 6900 ft. | # Of Holes: | 54 | | Interval Bottom: | 6910 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/24/2024 Interval Top: 6618 ft. Interval Bottom: 6910 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/9/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6618 ft. | # Of Holes: | 82 | | Interval Bottom: | 6910 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 2/20/2024 Interval Top: 6618 ft. Interval Bottom: 6748 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/9/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6618 ft. | # Of Holes: | 28 | | Interval Bottom: | 6748 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/24/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|