|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/19/2023 Measured TD: 7552 ft. Vertical TD: 7498 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/19/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20041820 | Expiration Date: | 8/30/2005 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1280 FNL 2140 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 1280 FNL 2140 FEL | | Proposed Depth/Form: | 7552 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NE4 | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 80, Drill Unit: W2NE4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: W2NE4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 4200 ft., Bottom: 5200 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/23/2004 | | Spud Date: | 10/15/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7552 ft. | Measured PB depth: | 7518 ft. | | True Vertical TD: | 7498 ft. | True Vertical PB depth: | 7464 ft. | | Top PZ Location: | Sec: Twp: | Footage: 1280 FNL 2140 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 1280 FNL 2140 FEL | | Log Types: | CBL, DUAL INDUCTION, COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 667 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 0 ft., Bottom: 667 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7541 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 170, Top: 6400 ft., Bottom: 7541 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4936 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 3975 ft., Bottom: 4936 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4386 ft. | | N | N | | NIOBRARA | 6881 ft. | | N | N | | FORT HAYS | 7141 ft. | | N | N | | CODELL | 7163 ft. | | N | N | | GRANEROS | 7447 ft. | | N | N |
Formation GRNHN Formation Classification: GW Status: AB - 10/19/2023 Interval Top: 7340 ft. Interval Bottom: 7370 ft.| Completed Information for Formation GREENHORN | | 1st Production Date: | 11/1/2004 | Choke Size: | | | Formation Name: | GREENHORN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/23/2004 | | Treatment Summary: | GREENHORN COMPLETION; FRAC'D THE GREENHORN 7340'-7370' WITH THE CODELL 7164'-7180' WITH 131,670 GAL FRAC FLUID AND 304,940# SAND. 10-31-04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation GRNHN. |
| | Perforation Data: | | Interval Top: | 7340 ft. | # Of Holes: | 120 | | Interval Bottom: | 7370 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/9/2023 Interval Top: 7164 ft. Interval Bottom: 7180 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/1/2004 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7164 ft. | # Of Holes: | 64 | | Interval Bottom: | 7180 ft. | Hole Size: | 0.38 in. |
|
Formation GRNNC Formation Classification: GW Status: CM - 12/28/2004 Interval Top: 6926 ft. Interval Bottom: 7370 ft.| Completed Information for Formation GREENHORN-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | GREENHORN-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/3/2005 | | Treatment Summary: | GRNHN-NBRR-CDL-COMMINGLE SET CBP @ 5000' 12-20-04. DRILL CBP @ 7070' 12-21-04 TO COMMINGLE THE GRNHN-NBRR-CDL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7153 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/28/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 36 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 36 | | CALC_GOR | 9778 | | CALC_MCF_GAS | 352 | | CASING_PRESS | 650 | | MCF_GAS | 352 | | TUBING_PRESS | 590 |
| | Perforation Data: | | Interval Top: | 6926 ft. | # Of Holes: | 244 | | Interval Bottom: | 7370 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/19/2023 Interval Top: 6926 ft. Interval Bottom: 7180 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/1/2004 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/23/2004 | | Treatment Summary: | NB-CD RECOMPLETION; FRAC'D THE CODELL 7164'-7180' WITH THE GREENHORN 7340'-7370' WITH 131,670 GAL FRAC FLUID AND 304,940# SAND. 10-31-04 SET CBP@7070'. 11-5-04. FRAC'D THE NIOBRARA 6926'-6956'WITH 183,246 GAL FRAC FLUID AND 211,932# 20/40 SAND. 11-7-04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6926 ft. | # Of Holes: | 124 | | Interval Bottom: | 7180 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/9/2023 Interval Top: 6926 ft. Interval Bottom: 6956 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/1/2004 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6926 ft. | # Of Holes: | 60 | | Interval Bottom: | 6956 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/19/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|