|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 1/26/2024 Measured TD: 8196 ft. Vertical TD: 8037 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 1/26/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20041763 | Expiration Date: | 8/23/2005 | | Proposed Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 575 FSL 1780 FWL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 575 FSL 1780 FWL | | Proposed Depth/Form: | 8200 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 4100 ft., Bottom: 5200 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 9/25/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 8196 ft. | Measured PB depth: | 8168 ft. | | True Vertical TD: | 8037 ft. | True Vertical PB depth: | 8009 ft. | | Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 575 FSL 1780 FWL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 575 FSL 1780 FWL | | Log Types: | CBL, COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 635 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 635 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8165 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 6790 ft., Bottom: 8165 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5227 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 3740 ft., Bottom: 5227 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4332 ft. | | N | N | | NIOBRARA | 7357 ft. | | N | N | | FORT HAYS | 7595 ft. | | N | N | | MOWRY | 8032 ft. | | N | N | | J SAND | 8044 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 1/26/2024 Interval Top: 8046 ft. Interval Bottom: 8086 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/3/2004 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/3/2004 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8046 ft. | # Of Holes: | 68 | | Interval Bottom: | 8086 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 8/2/2023 Interval Top: 7617 ft. Interval Bottom: 7640 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/3/2004 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7617 ft. | # Of Holes: | 92 | | Interval Bottom: | 7640 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 3/12/2011 Interval Top: 7380 ft. Interval Bottom: 8086 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/12/2011 | | Treatment Summary: | CIBP SET @ 7760' 2/19/2011. DRILLED OUT 3/2/2011. TUBING SET ON 3/2/11 AND COMMINGLED ON 3/5/2011. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7912 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/12/2011 | Test Method: | FLOWING | | Hours Tested: | 16 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 21 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 9688 | | CALC_MCF_GAS | 310 | | CASING_PRESS | 4898 | | GRAVITY_OIL | 58 | | MCF_GAS | 207 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 7380 ft. | # Of Holes: | 220 | | Interval Bottom: | 8086 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/26/2024 Interval Top: 7380 ft. Interval Bottom: 7640 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/3/2004 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/19/2011 | | Treatment Summary: | NIOBRARA - FRAC'D 147798 GAL FRAC FLUID AND 211500 # SAND
CODELL - FRAC'D WITH 122566 GAL FLUID AND 250320 # SAND | | Formation Treatment | | Treatment Date: | 11/3/2004 | | Treatment Summary: | SET CBP @6910'. 10/28/04. DRILLED OUT CBP @6910', 7504' AND 7746' TO COMMINGLE THE JNBCD. 10/31/04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 21 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 9688 | | CALC_MCF_GAS | 310 | | CASING_PRESS | 4898 | | GRAVITY_OIL | 58 | | MCF_GAS | 207 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 7380 ft. | # Of Holes: | 152 | | Interval Bottom: | 7640 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 8/2/2023 Interval Top: 7380 ft. Interval Bottom: 7410 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/3/2004 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7380 ft. | # Of Holes: | 60 | | Interval Bottom: | 7410 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/26/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|