|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2020 Measured TD: 8000 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2020 | | Wellbore Permit | DRIFTED | | Permit #: | 20063682 | Expiration Date: | 9/11/2007 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NW4 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: NW4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: W2NW4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: W2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 912 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: 0 ft., Bottom: 912 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7990 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 480, Top: 3970 ft., Bottom: 7990 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/15/2004 | | Spud Date: | 8/6/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 8000 ft. | Measured PB depth: | 7985 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY/COMPENSATED NEUTRON/DUAL INDUCTION; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 912 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 595, Top: 0 ft., Bottom: 912 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7990 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 465, Top: 3970 ft., Bottom: 7990 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4440 ft. | | N | N | | NIOBRARA | 6958 ft. | | N | N | | CODELL | 7212 ft. | | N | N | | J SAND | 7662 ft. | | N | N | | DAKOTA | 7866 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: SI - 10/1/2019 Interval Top: 7869 ft. Interval Bottom: 7900 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/15/2004 | | Treatment Summary: | FRAC W/ 25,565 GAL PURGEL III, 4000# 100 MESH SAND & 46,640# 20/40 SAND. PERFS: 7869-71', 7896-7900' |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DKTA. |
| | Perforation Data: | | Interval Top: | 7869 ft. | # Of Holes: | 24 | | Interval Bottom: | 7900 ft. | Hole Size: | 0.4 in. |
|
Formation DK-JD Formation Classification: GW Status: CM - 10/28/2004 Interval Top: 7662 ft. Interval Bottom: 7900 ft.| Completed Information for Formation DAKOTA-J SAND-D SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA-J SAND-D SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/15/2004 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DK-JD. |
| | Perforation Data: | | Interval Top: | 7662 ft. | # Of Holes: | 112 | | Interval Bottom: | 7900 ft. | Hole Size: | 0.4 in. |
|
Formation JSND Formation Classification: GW Status: SI - 9/1/2020 Interval Top: 7662 ft. Interval Bottom: 7700 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/15/2004 | | Treatment Summary: | FRAC W/ 69,688 GAL 18# VISTAR W/ 117,120# 20/40 SAND & 8000# SUPER LC 20/40 SAND. PERFS: 7662-70', 7682-88', 7692-7700' |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7622 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/28/2004 | Test Method: | PLUNGER LIFT | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 39 | | BBLS_OIL | 5 | | CASING_PRESS | 400 | | MCF_GAS | 321 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 7662 ft. | # Of Holes: | 88 | | Interval Bottom: | 7700 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: SI - 9/1/2020 Interval Top: 7214 ft. Interval Bottom: 7224 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/10/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/15/2004 | | Treatment Summary: | FRAC'D CODELL W/ 128,058 GALS OF VISTAR WITH 21# GEL LOADING AND 270,420#'S OF 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7214 ft. | # Of Holes: | 40 | | Interval Bottom: | 7224 ft. | Hole Size: | 0.42 in. |
|
Formation DKJCD Formation Classification: GW Status: CM - 10/31/2006 Interval Top: 7214 ft. Interval Bottom: 7900 ft.| Completed Information for Formation DAKOTA-J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.375 in. | | Formation Name: | DAKOTA-J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/15/2004 | | Treatment Summary: | COMMINGLE CODELL, J-SAND, AND DAKOTA. DAKOTA AND J-SAND PRODUCING THROUGH FLOW PLUG @ 7850 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/31/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 4 | | BTU_GAS | 1168 | | CALC_GOR | 3750 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 46 | | MCF_GAS | 15 | | TUBING_PRESS | 360 |
| | Perforation Data: | | Interval Top: | 7214 ft. | # Of Holes: | 152 | | Interval Bottom: | 7900 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 08/31/2020 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|