|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2022 Measured TD: 8115 ft. Vertical TD: 8115 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2022 | | Wellbore Permit | | | Permit #: | 20064478 | Expiration Date: | 10/9/2007 | | Proposed Depth/Form: | 8115 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 905 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 625, Top: 0 ft., Bottom: 905 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8059 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 760, Top: 3956 ft., Bottom: 8059 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/26/2005 | | Spud Date: | 5/7/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 8115 ft. | Measured PB depth: | 8039 ft. | | True Vertical TD: | 8115 ft. | True Vertical PB depth: | 8039 ft. | | Log Types: | CBL, GR, CDCN, DIGL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 905 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 625, Top: 0 ft., Bottom: 905 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8059 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 760, Top: 3956 ft., Bottom: 8059 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4557 ft. | | N | N | | NIOBRARA | 7186 ft. | | N | N | | FORT HAYS | 7437 ft. | | N | N | | CODELL | 7460 ft. | | N | N | | J SAND | 7915 ft. | | N | N |
Formation JSND Formation Classification: OW Status: SI - 4/1/2022 Interval Top: 7915 ft. Interval Bottom: 7980 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/17/2007 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/16/2012 | Treatment End Date: | N/A | | Treatment Summary: | DRILLED OUT SAND PLUG TO COMMINGLE JSND WITH NB/CD PRODUCTION | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 3/31/2011 | | Treatment Summary: | SAND PLUG SET@ 7988 | | Formation Treatment | | Treatment Date: | 2/9/2007 | | Treatment Summary: | J-REC, PERF AND FRAC JSND W/161,121 GALS FLUID & 120,560# 30/50 SAND 7915-7922 (4SPF) 7926-7936 (2SPF) 7950-7980 (2SPF) |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7915 ft. | # Of Holes: | 108 | | Interval Bottom: | 7980 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 4/28/2011 Interval Top: 7460 ft. Interval Bottom: 7476 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/13/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/5/2011 | | Treatment Summary: | REPERF CDL (4/1/2011) 7460-7472 HOLES 12 SIZE .38
Re-Frac Codell down 4-1/2" Csg w/ 200,569 gal Slickwater w/ 150,180# 40/70, 4,000# SB Excel. | | Formation Treatment | | Treatment Date: | 5/26/2005 | | Treatment Summary: | 149760 GAL FLUID FRAC INFO REPRESENTS: CODL 115600 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 42 | | CALC_BBLS_OIL | 42 | | CALC_GOR | 2720 | | CALC_MCF_GAS | 114 | | CASING_PRESS | 497 | | GRAVITY_OIL | 51 | | MCF_GAS | 114 | | TUBING_PRESS | 183 |
| | Perforation Data: | | Interval Top: | 7460 ft. | # Of Holes: | 60 | | Interval Bottom: | 7476 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 3/24/2007 Interval Top: 7460 ft. Interval Bottom: 7980 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 2/22/2007 | Choke Size: | 0.375 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/26/2005 | | Treatment Summary: | CODL PERFS 5/24/2005 7460 - 7476 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7885 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/24/2007 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_OIL | 5 | | CALC_GOR | 52600 | | CALC_MCF_GAS | 263 | | CASING_PRESS | 350 | | GRAVITY_OIL | 54 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7460 ft. | # Of Holes: | | | Interval Bottom: | 7980 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 6/1/2012 Interval Top: 7233 ft. Interval Bottom: 7980 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/22/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/1/2012 | Treatment End Date: | N/A | | Treatment Summary: | DRILLED OUT SAND PLUG TO COMMINGLE JSND WITH NB/CD PRODUCTION | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7894 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/1/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | BTU_GAS | 1255 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 12281 | | CALC_MCF_GAS | 42 | | CASING_PRESS | 255 | | GRAVITY_OIL | 48 | | MCF_GAS | 42 | | TUBING_PRESS | 220 |
| | Perforation Data: | | Interval Top: | 7233 ft. | # Of Holes: | 222 | | Interval Bottom: | 7980 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 4/1/2022 Interval Top: 7233 ft. Interval Bottom: 7476 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/13/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/5/2011 | | Treatment Summary: | CDRF-NBREC |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7415 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/26/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 25 | | BTU_GAS | 1293 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 3320 | | CALC_MCF_GAS | 83 | | CASING_PRESS | 1919 | | GRAVITY_OIL | 52 | | MCF_GAS | 83 | | TUBING_PRESS | 1451 |
| | Perforation Data: | | Interval Top: | 7233 ft. | # Of Holes: | 114 | | Interval Bottom: | 7476 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/10/2011 Interval Top: 7233 ft. Interval Bottom: 7318 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/13/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/5/2011 | | Treatment Summary: | Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 235,696 gal Slickwater w/ 200,820# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7233 ft. | # Of Holes: | 54 | | Interval Bottom: | 7318 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 03/31/2022 |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|