Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22000
Well Classification: OW Status: PA - 4/6/2018
Well Name/No:HIGHWAY #14-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/6/2018
FacilityID:271122LocationID:332229
County:WELD #123Location:SESW 12 2N66W 6
Field:WATTENBERG - #90750Elevation:5010 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FSL  2100 FWLLat/Long: 40.147398 / -104.727478Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.147530 / -104.727330Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/3/2011
End Date: 8/3/2011
Reported: 10/10/2011
Prior to rule 205A.b.(2)(A)
Days to report: 68
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/6/2018             Measured TD: 7605 ft.    Vertical TD: 7605 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/6/2018
Wellbore Permit
Permit #:20040106 Expiration Date:2/3/2005
Proposed Depth/Form:7650 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2SW

Wellbore Completed
Completion Date:3/12/2004
Spud Date:2/25/2004Spud Date Is:ACTUAL
Measured TD:7605 ft.Measured PB depth:7576 ft.
True Vertical TD:7605 ft.True Vertical PB depth:7576 ft.
Log Types:DI, DN, GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 940 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 0 ft., Bottom: 940 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7601 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 205, Top: 6510 ft., Bottom: 7601 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4468 ft.NN
NIOBRARA7162 ft.NN
FORT HAYS7411 ft.NN
CODELL7434 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/15/2010                 Interval Top: 7434 ft.    Interval Bottom: 7452 ft.

 Completed Information for Formation CODELL
1st Production Date:6/30/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/16/2010
Treatment Summary:DRILL OUT CIBP SET @ 7380' TO COMMINGLE CODL W/ NBRR.
Formation Treatment
Treatment Date:3/12/2004
Treatment Summary:CIBP @ 7380'. OUR INTENT IS TO DRILL OUT CIBP AND COMMINGLE WITH THE NIOBRARA WITHIN THE NEXT SIX MONTHS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7434 ft.# Of Holes:36
Interval Bottom:7452 ft.Hole Size:0.31 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/6/2018                  Interval Top: 7207 ft.    Interval Bottom: 7452 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/22/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/3/2011
Treatment Summary:CDL REPERF (7/21/2011) 7436-7452 HOLES 32 SIZE .38 Re-Frac Codell-Niobrara down 4-1/2" Csg w/ 202,986 gal Slickwater w/ 150,100# 40/70, 4,000# SB Excel, 0#.
Formation Treatment
Treatment Date:6/16/2010
Treatment Summary:NBRR PERF 7207-7294 HOLES 66 SIZE 0.42. CODL PERF 7434-7452 HOLES 36 SIZE 0.31.
Formation Treatment
Treatment Date:3/12/2004
Treatment Summary:500 GAL FLUID; 179,675 GAL FLUID, 115,060# 30/50 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7385 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/6/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 2
BTU_GAS 1275
CALC_BBLS_OIL 2
CALC_GOR 12000
CALC_MCF_GAS 24
CASING_PRESS 714
GRAVITY_OIL 51
MCF_GAS 24
TUBING_PRESS 609
Perforation Data:
Interval Top:7207 ft.# Of Holes:134
Interval Bottom:7452 ft.Hole Size:0.31 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/15/2010                 Interval Top: 7207 ft.    Interval Bottom: 7294 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/5/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/30/2010
Treatment Summary:NO ADDITIONAL TREATMENT.
Formation Treatment
Treatment Date:7/17/2008
Treatment Summary:NEW PERFORATION INTERVAL: 7207-7217, 7284-7294. 30 SPF, 600 PERFORATIONS. 150000 GAL FLUID, 196000 LBS 30/50 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BTU_GAS 1254
CALC_BBLS_H2O 0
CALC_BBLS_OIL 6
CALC_GOR 14666
CALC_MCF_GAS 88
CASING_PRESS 435
GRAVITY_OIL 52
TUBING_PRESS 369
Perforation Data:
Interval Top:7207 ft.# Of Holes:66
Interval Bottom:7294 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/06/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No