|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 8/8/2018 Measured TD: 7829 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 8/8/2018 | Wellbore Permit | | Permit #: | 20032542 | Expiration Date: | 1/28/2005 | Proposed Depth/Form: | 7850 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NE | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 80, Drill Unit: W/2NE | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NE | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 493-2 , Unit Acreage: 80, Drill Unit: W/2NE |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 3/11/2004 | Spud Date Is: | ACTUAL | Measured TD: | 7829 ft. | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL, MICROLOG, ARRAY INDUCTION, COMPENSATED NEUTRON | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 542 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 390, Top: 0 ft., Bottom: 542 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7811 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 6550 ft., Bottom: 7811 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4720 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 210, Top: 4014 ft., Bottom: 4724 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4462 ft. | | N | N | NIOBRARA | 6934 ft. | | N | N | FORT HAYS | 7215 ft. | | N | N | CODELL | 7240 ft. | | N | N | CARLILE | 7260 ft. | | N | N | GREENHORN | 7301 ft. | | N | N | MOWRY | 7691 ft. | | N | N | J SAND | 7708 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 10/17/2018 Interval Top: 7718 ft. Interval Bottom: 7794 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/1/2004 | Treatment Summary: | FRAC'D THE J SAND W/ 146,000 GAL SILVERSTIM CMG FRAC FLUID AND 202,860# 20/40 SAND, 03-31-04 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7718 ft. | # Of Holes: | 98 | Interval Bottom: | 7794 ft. | Hole Size: | 0.45 in. |
|
Formation GRNHN Formation Classification: OW Status: AB - 10/17/2018 Interval Top: 7452 ft. Interval Bottom: 7482 ft. Completed Information for Formation GREENHORN | 1st Production Date: | N/A | Choke Size: | | Formation Name: | GREENHORN | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/1/2004 | Treatment Summary: | FRAC'D THE GREENHORN W/ 118,000 GALS 200,000# 20/40 FRAC SAND AND 31,000# PR-6000 20/40, 04-04-04 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation GRNHN. |
| Perforation Data: | Interval Top: | 7452 ft. | # Of Holes: | 60 | Interval Bottom: | 7482 ft. | Hole Size: | 0.48 in. |
|
Formation CODL Formation Classification: OW Status: CM - 4/7/2010 Interval Top: 7241 ft. Interval Bottom: 7256 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/1/2004 | Treatment Summary: | FRAAC'D THE CODELL W/ 118,000 GALS 200,000# 20/40 FRAC SAND AND 31,000# PR-6000 20/40, 04-01-04 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7241 ft. | # Of Holes: | 60 | Interval Bottom: | 7256 ft. | Hole Size: | 0.48 in. |
|
Formation JGRNC Formation Classification: OW Status: CM - 8/8/2018 Interval Top: 6952 ft. Interval Bottom: 7794 ft. Completed Information for Formation JSND-GREENHORN-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | JSND-GREENHORN-NIOBRARA-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/1/2004 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7713 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/10/2004 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 58 | BBLS_OIL | 49 | CALC_BBLS_H2O | 58 | CALC_BBLS_OIL | 49 | CALC_GOR | 13388 | CALC_MCF_GAS | 656 | CASING_PRESS | 1400 | MCF_GAS | 656 | TUBING_PRESS | 1090 |
| Perforation Data: | Interval Top: | 6952 ft. | # Of Holes: | 278 | Interval Bottom: | 7794 ft. | Hole Size: | 0.45 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/17/2018 Interval Top: 6952 ft. Interval Bottom: 7256 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/5/2010 | Treatment Summary: | PERF WERE ADDED TO THE NIOBRARA @ 7021-7037', 4SPF, 60 HOLES. NIOBRARA - FRAC'D WITH 142,296 GAL FRAC FLUID CONTAINING 250,680 # SAND. CODELL - FRAC'D WITH 124,530 GAL FRAC FLUID CONTAINING 250,940 # SAND. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7694 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/7/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 13 | BBLS_OIL | 18 | BTU_GAS | 1147 | CALC_BBLS_H2O | 13 | CALC_BBLS_OIL | 18 | CALC_GOR | 21666 | CALC_MCF_GAS | 390 | CASING_PRESS | 363 | GRAVITY_OIL | 62 | MCF_GAS | 390 | TUBING_PRESS | 254 |
| Perforation Data: | Interval Top: | 6952 ft. | # Of Holes: | | Interval Bottom: | 7256 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 4/7/2010 Interval Top: 6952 ft. Interval Bottom: 6982 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/1/2004 | Treatment Summary: | FRAC'D THE NIOBRARA W/ 100,000# 20/40 FRAC SAND AND 100,000# 20/40 PR-6000, 1/2 PPG THRU 4 PPG, 142,000 GALS FLUID, 04-01-04 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6952 ft. | # Of Holes: | 60 | Interval Bottom: | 6982 ft. | Hole Size: | 0.48 in. |
|
|
|
|
|
Reported Plugged | Y | 10/17/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|