Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21954
Well Classification: OW Status: SI - 11/5/2025
Well Name/No:WEBSTER #32-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/5/2025
FacilityID:270965LocationID:332192
County:WELD #123Location:SWNE 11 6N65W 6
Field:WATTENBERG - #90750Elevation:4775 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2165FNL  1810 FELLat/Long: 40.502184 / -104.627538Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.502190 / -104.627220Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/30/2012
End Date: 5/30/2012
Reported: 4/26/2013
Days to report: 331
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 11/5/2025             Measured TD: 7380 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 11/5/2025
Wellbore PermitDRIFTED
Permit #:20032586 Expiration Date:1/22/2005
Proposed Depth/Form:7325 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-1 , Unit Acreage: 80, Drill Unit: S/2NE

Wellbore Completed
Completion Date:N/A
Spud Date:2/6/2004Spud Date Is:ACTUAL
Measured TD:7380 ft.Measured PB depth:7374 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Log Types:GR, IND, DENSITY, NEUTRON, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 451 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 451 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7362 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 3880 ft., Bottom: 7362 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3355 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 54 ft., Bottom: 3880 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2900 ft.NN
PARKMAN3718 ft.NN
SUSSEX4116 ft.NN
SHANNON4485 ft.NN
NIOBRARA6864 ft.NN
FORT HAYS7122 ft.NN
CODELL7170 ft.NN
CARLILE7210 ft.NN
GREENHORN7220 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/5/2025                 Interval Top: 7172 ft.    Interval Bottom: 7184 ft.

 Completed Information for Formation CODELL
1st Production Date:6/23/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/17/2004
Treatment Summary:2/17/04 BJ SERVICES FRACED W/2534 BBL OF 20 # VISTAR GEL, 217,180# OF 20/40 MESH SAND AND 8,000# OF 20/40 MESH SUPER LC RESIN SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 27
BTU_GAS 1312
CALC_GOR 5519
CASING_PRESS 190
GRAVITY_OIL 45
MCF_GAS 149
Perforation Data:
Interval Top:7172 ft.# Of Holes:54
Interval Bottom:7184 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 11/5/2025                 Interval Top: 6874 ft.    Interval Bottom: 7184 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/23/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 2
BTU_GAS 1255
CALC_BBLS_H2O 9
CALC_BBLS_OIL 2
CALC_GOR 1850
CALC_MCF_GAS 37
CASING_PRESS 1526
GRAVITY_OIL 49
MCF_GAS 37
TUBING_PRESS 631
Perforation Data:
Interval Top:6874 ft.# Of Holes:82
Interval Bottom:7184 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/5/2025                 Interval Top: 6874 ft.    Interval Bottom: 7004 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/23/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/30/2012
Treatment Summary:Nio "A" 6874-6876, "B"6996-7004
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6874 ft.# Of Holes:28
Interval Bottom:7004 ft.Hole Size:0.421875 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY03/27/2026
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
01/18/2025
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No