Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21867
Well Classification: OW Status: PA - 11/16/2023
Well Name/No:ROY CARLSON #43-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/16/2023
FacilityID:270312LocationID:332122
County:WELD #123Location:NESE 7 6N64W 6
Field:WATTENBERG - #90750Elevation:4740 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1976FSL  656 FELLat/Long: 40.498614 / -104.586367Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.498690 / -104.585920Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/5/2012
End Date: 4/5/2012
Reported: 4/26/2013
Days to report: 386
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 11/16/2023             Measured TD: 7250 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 11/16/2023
Wellbore Permit
Permit #:20032304 Expiration Date:12/8/2004
Proposed Depth/Form:7440 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2SE

Wellbore Completed
Completion Date:N/A
Spud Date:1/11/2004Spud Date Is:ACTUAL
Measured TD:7250 ft.Measured PB depth:7238 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR, IND, DENSITY, NEUTRON, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 442 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 442 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7238 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 2775 ft., Bottom: 7238 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2775 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 354, Top: 0 ft., Bottom: 2775 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2795 ft.NN
PARKMAN3625 ft.NN
SUSSEX4175 ft.NN
SHANNON4415 ft.NN
NIOBRARA6690 ft.NN
FORT HAYS6950 ft.NN
CODELL6997 ft.NN
CARLILE7018 ft.NN
GREENHORN7046 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/3/2012                  Interval Top: 6998 ft.    Interval Bottom: 7006 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/5/2012
Treatment Summary:Re-Perf Codell, Frac'd Codell w/ 119 bbl FE-1A pad, 595 bbls 26# pHaser pad, 2004 bbls 26# pHaser fluid system, 217980# 20/40 Preferd Rock, 8000# 20/40 SB Excel.
Formation Treatment
Treatment Date:1/21/2004
Treatment Summary:01/21/04 BJ SERVICES FRACED WITH 2706 BBL OF 20# VISTAR GEL, 218500# OF 20/40 MESH SAND AND 8,000# OF 20/40 MESH SUPER LC RESIN SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 203
BTU_GAS 1349
CALC_GOR 2221
CASING_PRESS 260
GRAVITY_OIL 49
MCF_GAS 451
Perforation Data:
Interval Top:6998 ft.# Of Holes:24
Interval Bottom:7006 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 11/16/2023                Interval Top: 6708 ft.    Interval Bottom: 7006 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/11/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:6989 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/20/2012Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 29
BTU_GAS 1360
CALC_BBLS_H2O 4
CALC_BBLS_OIL 29
CALC_GOR 2448
CALC_MCF_GAS 71
CASING_PRESS 1600
GRAVITY_OIL 54
MCF_GAS 71
TUBING_PRESS 1300
Perforation Data:
Interval Top:6708 ft.# Of Holes:52
Interval Bottom:7006 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/18/2012                 Interval Top: 6708 ft.    Interval Bottom: 6836 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/5/2012
Treatment Summary:Perf'd Niobrara "A" 6708-6710' (4 holes), Niobrara "B" 6828-6836' (24 holes) Frac'd Niobrara w/ 119 bbl Active pad, 1449 bbls of Slickwater pad, 144 bbls of pHaser 20# pad, 2378 bbls 24# pHaser fluid system and 237340# of 20/42 Preferred Rock, 12000 # 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6708 ft.# Of Holes:28
Interval Bottom:6836 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/16/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No