Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21847
Well Classification: OW Status: PA - 12/28/2023
Well Name/No:LDS #16-24
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/28/2023
FacilityID:270204LocationID:336280
County:WELD #123Location:SESE 24 3N68W 6
Field:WATTENBERG - #90750Elevation:4900 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:663FSL  659 FELLat/Long: 40.206296 / -104.944235Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.206366 / -104.944128Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 12/28/2023             Measured TD: 7457 ft.    Vertical TD: 7457 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 12/28/2023
Wellbore Permit
Permit #:20032184 Expiration Date:11/24/2004
Proposed Depth/Form:7400 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2

Wellbore Completed
Completion Date:12/22/2003
Spud Date:12/5/2003Spud Date Is:ACTUAL
Measured TD:7457 ft.Measured PB depth:7432 ft.
True Vertical TD:7457 ft.True Vertical PB depth:7432 ft.
Log Types:CDCNGRL, DIL, CBL, PERF RECORD
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 747 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 747 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7446 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 535, Top: 3204 ft., Bottom: 7446 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4078 ft.NN
SHANNON4611 ft.NN
NIOBRARA7019 ft.NN
FORT HAYS7269 ft.NN
CODELL7293 ft.NN

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 12/28/2023                Interval Top: 7022 ft.    Interval Bottom: 7315 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/4/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/28/2010
Treatment Summary:NB REPERF (12/28/10) 7036-7166 HOLES 54 SIZE .38 CD REPERF (12/13/10) 7293-7315 HOLES 44 SIZE .38 Re-Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 248,415 gal Slickwater w/ 200,900# 40/70, 4,040# SB Excel. Re-Frac Codell down 4-1/2" Csg w/ 194,057 gal Slickwater w/ 150,820# SB Excel, 4,040# SB Excel.
Formation Treatment
Treatment Date:12/22/2003
Treatment Summary:500 GAL FLUID, 150278 GAL FLUID, 102980 LBS 20/40 SAND CODELL 7295-7311 NIOBRARA 7022-7088.
Tubing Size:2.375 in.Tubing Setting Depth:7272 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/2/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 1
BTU_GAS 1195
CALC_BBLS_OIL 1
CALC_GOR 266000
CALC_MCF_GAS 26
CASING_PRESS 1749
GRAVITY_OIL 48
MCF_GAS 26
TUBING_PRESS 180
Perforation Data:
Interval Top:7022 ft.# Of Holes:144
Interval Bottom:7315 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/28/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No