Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21639
Well Classification: GW Status: PA - 11/21/2024
Well Name/No:FRICO #16-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/21/2024
FacilityID:269167LocationID:332588
County:WELD #123Location:SWSW 15 3N65W 6
Field:WATTENBERG - #90750Elevation:4805 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:480FSL  1185 FWLLat/Long: 40.219397 / -104.655146Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.219570 / -104.655190Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/21/2024             Measured TD: 8150 ft.    Vertical TD: 7246 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/21/2024
Wellbore PermitDIRECTIONAL
Permit #:20031437 Expiration Date:8/21/2004
Proposed Top PZ Location:Sec:15 Twp: 3N 65W Footage: 586 FSL  691 FEL
Bottom Hole Location:Sec:15 Twp: 3N 65W Footage: 587 FSL  641 FEL
Proposed Depth/Form:8350 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-111 , Unit Acreage: 80, Drill Unit: E/2

Wellbore Completed
Completion Date:10/14/2003
Spud Date:9/29/2003Spud Date Is:ACTUAL
Measured TD:8150 ft.Measured PB depth:8116 ft.
True Vertical TD:7246 ft.True Vertical PB depth:7204 ft.
Top PZ Location:Sec:15 Twp: 3N 65WFootage: 586 FSL  691 FEL
Bottom Hole Location:Sec:15 Twp: 3N 65WFootage: 587 FSL  641 FEL
Log Types:AILCGR, CNTLDGR, BPCVGR, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1856 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 0 ft., Bottom: 1856 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8133 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 4012 ft., Bottom: 8133 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 2105 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 770 ft., Bottom: 2105 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 1874 ft., Depth: , Bottom: 2105 ft., Sacks: 100, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
SUSSEX4891 ft.NN
NIOBRARA7728 ft.NN
FORT HAYS7990 ft.NN
CODELL8013 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/1/2024                  Interval Top: 8012 ft.    Interval Bottom: 8028 ft.

 Completed Information for Formation CODELL
1st Production Date:11/9/2003Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/24/2003
Treatment Summary:8/16/08 SET BP @7970' FOR NBRR RECOMPLETE. 11/01/08 REMOVE BP AND COMMINGLE WITH NBRR.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8012 ft.# Of Holes:78
Interval Bottom:8028 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/21/2024                Interval Top: 7732 ft.    Interval Bottom: 8028 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/9/2003Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/28/2010
Treatment Summary:NBRR PERF 7732-7898 HOLES 107 SIZE 0.42 CODL PERF 8012-8028 SIZE 78 SIZE 0.38 REPERF CODL 8012-8028 SIZE 64 SIZE 0.38 REFRAC CODL W/ 159,499 GAL SW & 116,840# 40/70 SAND & 4,000# SUPERLC.
Formation Treatment
Treatment Date:10/24/2007
Treatment Summary:CLEAN OUT SAND PLUG OVER CODL. CODL PERFS 10/23/2003 > 8014-8028 (1 SPF)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 18
BTU_GAS 1276
CALC_BBLS_H2O 0
CALC_BBLS_OIL 4
CALC_GOR 14000
CALC_MCF_GAS 56
CASING_PRESS 1300
GRAVITY_OIL 57
MCF_GAS 239
TUBING_PRESS 387
Perforation Data:
Interval Top:7732 ft.# Of Holes:185
Interval Bottom:8028 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/1/2024                  Interval Top: 7732 ft.    Interval Bottom: 7898 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/9/2003Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2007
Treatment Summary:REPRF NBRR > 7732-7794 (1SPF) 7860-7898 (1SPF). REFRAC NBRR W/248,560 GALS FLUID & 201,700# 30/50 SAND. NBRR PERFS 10/23/03 > 7734-7787 (7SOA)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7732 ft.# Of Holes:107
Interval Bottom:7898 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/21/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
10/24/2024
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No