|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/2/2018 Measured TD: 8330 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/2/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20031132 | Expiration Date: | 7/22/2004 | | Proposed Depth/Form: | 8250 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 |
| | |
| Wellbore Completed | | Completion Date: | 11/7/2003 | | Spud Date: | 10/29/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 8330 ft. | Measured PB depth: | 8318 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec:34 Twp: 2N 68W | Footage: 544 FSL 2136 FEL | | Bottom Hole Location: | Sec:34 Twp: 2N 68W | Footage: 546 FSL 2137 FEL | | Log Types: | CBL,MICRO LOG,ARRAY INDUCTION,COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 670 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 674, Top: 0 ft., Bottom: 670 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8330 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 7080 ft., Bottom: 8330 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5350 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 4120 ft., Bottom: 5350 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5350 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 4120 ft., Bottom: 5350 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4517 ft. | | N | N | | NIOBRARA | 7448 ft. | | N | N | | FORT HAYS | 7736 ft. | | N | N | | CODELL | 7757 ft. | | N | N | | GREENHORN | 7815 ft. | | N | N | | BENTONITE | 8020 ft. | | N | N | | MOWRY | 8172 ft. | | N | N | | J SAND | 8188 ft. | | N | N | | SKULL CREEK | 8275 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/2/2018 Interval Top: 8198 ft. Interval Bottom: 8219 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/7/2003 | | Treatment Summary: | FRAC'D W/192,268 GAL SLICK WATER AND 161,420# 20/40 SAND. 11-10-03 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 29 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 29 | | CALC_MCF_GAS | 1040 | | CASING_PRESS | 1050 | | MCF_GAS | 1040 | | TUBING_PRESS | 850 |
| | Perforation Data: | | Interval Top: | 8198 ft. | # Of Holes: | 72 | | Interval Bottom: | 8219 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/18/2004 Interval Top: 7760 ft. Interval Bottom: 7778 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/7/2003 | | Treatment Summary: | FRAC'D THE CODELL W/128,993 GAL SILVERSTIM FLUID AND 301,000# 20/40 FRAC SAND.3/8/04 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8185 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/18/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 51 | | CALC_BBLS_H2O | 30 | | CALC_BBLS_OIL | 51 | | CALC_GOR | 4176 | | CALC_MCF_GAS | 213 | | CASING_PRESS | 1050 | | MCF_GAS | 213 | | TUBING_PRESS | 850 |
| | Perforation Data: | | Interval Top: | 7760 ft. | # Of Holes: | 72 | | Interval Bottom: | 7778 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/25/2006 Interval Top: 7520 ft. Interval Bottom: 8219 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/24/2006 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/7/2003 | | Treatment Summary: | DRILLED UP CBP @ 7650' TO COMMINGLE JNBCD 5/23/06 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8185 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/25/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 9 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 17444 | | CALC_MCF_GAS | 157 | | CASING_PRESS | 1015 | | MCF_GAS | 157 | | TUBING_PRESS | 325 |
| | Perforation Data: | | Interval Top: | 7520 ft. | # Of Holes: | 264 | | Interval Bottom: | 8219 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/2/2018 Interval Top: 7520 ft. Interval Bottom: 7778 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/24/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/18/2006 | | Treatment Summary: | NBRR-CDL RECOMPLETION. FRAC CODL (7760-7778')W/128,993 GAL SILVERSTIM FLD & 301,000#20/40 FRAC SAND.3/8/04. SET CBP @7650', 5/15/06. FRAC NBRR (7520-7550') W/173,796 GAL FRAC FLUID AND 300,320# SAND. 5/18/2006 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7520 ft. | # Of Holes: | 144 | | Interval Bottom: | 7778 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/02/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|