|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/12/2018 Measured TD: 8256 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/12/2018 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 10/19/2010 | | Proposed Depth/Form: | 8235 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 746 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 286, Top: 16 ft., Bottom: 746 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8235 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 6660 ft., Bottom: 8235 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5519 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 4130 ft., Bottom: 5519 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/30/2003 | | Spud Date: | 10/13/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 8256 ft. | Measured PB depth: | 8215 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIGLGR, CDCNGR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 726 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 286, Top: 0 ft., Bottom: 726 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8230 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6660 ft., Bottom: 8230 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5524 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 4130 ft., Bottom: 5530 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5524 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 4130 ft., Bottom: 5530 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4550 ft. | | N | N | | SHANNON | 5092 ft. | | N | N | | NIOBRARA | 7346 ft. | | N | N | | FORT HAYS | 7608 ft. | | N | N | | CODELL | 7631 ft. | | N | N | | J SAND | 8070 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 10/12/2018 Interval Top: 8086 ft. Interval Bottom: 8118 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/24/2003 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/20/2011 | | Treatment Summary: | REMOVED SAND PLUG SET @ 7860-7862 TO COMMINGLE JSND WITH NB/CD | | Formation Treatment | | Treatment Date: | 4/10/2010 | | Treatment Summary: | SET SAND PLUG @ 7780. OUR INTENT IS TO REMOVE THE SAND PLUG TO COMMINGLE THE WELL IN THE NEXT SIX MONTHS. | | Formation Treatment | | Treatment Date: | 10/30/2003 | | Treatment Summary: | FRAC'D JSND W/ 115740# 30/50 MESH; 106218 GAL SAND LADEN FLUID |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 3 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 55667 | | CALC_MCF_GAS | 167 | | CASING_PRESS | 654 | | GRAVITY_OIL | 60 | | MCF_GAS | 167 | | TUBING_PRESS | 258 |
| | Perforation Data: | | Interval Top: | 8086 ft. | # Of Holes: | 78 | | Interval Bottom: | 8118 ft. | Hole Size: | 0.34 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/6/2012 Interval Top: 7418 ft. Interval Bottom: 8118 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 12/27/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/20/2011 | | Treatment Summary: | REMOVED SAND PLUG SET @ 7860-7862 TO COMMINGLE JSND WITH NB/CD |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/6/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 23 | | BTU_GAS | 1327 | | CALC_BBLS_OIL | 23 | | CALC_GOR | 4435 | | CALC_MCF_GAS | 102 | | CASING_PRESS | 471 | | GRAVITY_OIL | 48 | | MCF_GAS | 102 |
| | Perforation Data: | | Interval Top: | 7418 ft. | # Of Holes: | 192 | | Interval Bottom: | 8118 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/12/2018 Interval Top: 7418 ft. Interval Bottom: 7650 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/23/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/21/2010 | | Treatment Summary: | NBRR PERF 7418-7510 HOLES 50 SIZE 0.38. CODL PERF 7632-7650 HOLES 54 SIZE 0.38. FRAC NBRR W/ 500 GAL 15% HCL & 245840 GAL SW & 200100# 40/70 SAND & 4000# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/14/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1122 | | CALC_BBLS_OIL | 77 | | CALC_GOR | 2429 | | CALC_MCF_GAS | 187 | | CASING_PRESS | 200 | | GRAVITY_OIL | 48 |
| | Perforation Data: | | Interval Top: | 7418 ft. | # Of Holes: | 114 | | Interval Bottom: | 7650 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/12/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|